Off-Location Flowlines |
Facility ID: 465037 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26K South Gas Lift Line | Start Location ID: 435421 | Location: NESW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/24/2014 |
| |
Facility ID: 465038 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26K North Gas Lift Line | Start Location ID: 435421 | Location: NESW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/26/2014 |
| |
Facility ID: 465038 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K North Gas Lift Line | Start Location ID: 435421 | Location: NESW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/26/2014 |
| |
Facility ID: 465011 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K North Bulk Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465008 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K North Test Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465037 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K South Gas Lift Line | Start Location ID: 435421 | Location: NESW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/24/2014 |
| |
Facility ID: 465018 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K North Blowdown Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465021 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K South Test Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/13/2014 |
| |
Facility ID: 465022 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K South Blowdown Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/13/2014 |
| |
Facility ID: 465024 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K South Bulk Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/13/2014 |
| |