Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37880
Well Classification: OW Status: SI - 3/1/2025
Well Name/No:Razor #26K-3505A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2025
FacilityID:433969LocationID:430308
County:WELD #123Location:NESW 26 10N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4738 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2449FSL  1949 FWLLat/Long: 40.809092 / -103.834644Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.809096 / -103.834645Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/31/2014
End Date: 8/29/2014
Reported: 10/7/2014
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2025             Measured TD: 12260 ft.    Vertical TD: 5602 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/22/2015
Proposed Top PZ Location:Sec:26 Twp: 10N 58W Footage: 1663 FSL  1789 FWL
Bottom Hole Location:Sec:35 Twp: 10N 58W Footage: 600 FSL  1485 FWL
Proposed Depth/Form:12324 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-314 , Unit Acreage: 960, Drill Unit: S/2 OF 26, 35 ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 719, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5917 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 415, Top: 0 ft., Bottom: 5917 ft.
Casing:String Type: 2ND, Hole Size: 6 in., Size: 4.5 in., Top: 5135 ft., Depth: 12324 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/1/2014
Spud Date:2/18/2014Spud Date Is:ACTUAL
Measured TD:12260 ft.Measured PB depth:10957 ft.
True Vertical TD:5602 ft.True Vertical PB depth:5605 ft.
Top PZ Location:Sec:26 Twp: 10N 58WFootage: 1485 FSL  1649 FWL
Bottom Hole Location:Sec:35 Twp: 10N 58WFootage: 604 FSL  1364 FWL
Log Types:LWD/Mud/CBL/CAL/IND/POR/SON/Triple Combo
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 6.625 in., Top: 0 ft., Depth: 1572 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 719, Top: 0 ft., Bottom: 1572 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5991 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 412, Top: 0 ft., Bottom: 5991 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 3664 ft., Depth: 11002 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE1691 ft.NN
HYGIENE3513 ft.NN
SHARON SPRINGS5537 ft.NN
NIOBRARA5547 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 3/1/2025                  Interval Top: 6053 ft.    Interval Bottom: 10905 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/12/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/31/2014Treatment End Date:8/30/2014
Treatment Summary:3-stage YF822LpH frac: 8934# 100 Mesh, 346010# 16/30 white sand, 9031 clean vol pumped; 32-stage QuadraFrac: 119260# 100 Mesh, 623500# 16/30 Wh snd, 4140121# 20/40 Wh snd, 250 bbls 15% HCl, 101247 bbls clean volume pumped.
Total fluid used in treatment (bbls):110528Max pressure during treatment (psi):6525
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):250Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):23803
Fresh water used in treatment (bbls):110278Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5237825Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5633 ft.
Tubing Packer Depth:5633 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2014Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 325
BBLS_OIL 1002
BTU_GAS 1395
CALC_BBLS_H2O 325
CALC_BBLS_OIL 1002
CALC_GOR 853
CALC_MCF_GAS 855
CASING_PRESS 915
GRAVITY_OIL 37
MCF_GAS 855
TUBING_PRESS 475
Perforation Data:
Interval Top:6053 ft.# Of Holes:1152
Interval Bottom:10905 ft.Hole Size:0.375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No