|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/20/2014 Measured TD: 6017 ft. Vertical TD: 5649 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/20/2014 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/22/2015 | Proposed Top PZ Location: | Sec:26 Twp: 10N 58W | Footage: 1912 FNL 1372 FWL | Bottom Hole Location: | Sec:23 Twp: 10N 58W | Footage: 100 FNL 1485 FWL | Proposed Depth/Form: | 13342 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-314 , Unit Acreage: 960, Drill Unit: ALL 23, N/2 26 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: , Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 719, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6200 ft., Weight: 29 , Citings Type: PLANNED | Cement: | Sacks: 433, Top: 0 ft., Bottom: 6200 ft. | Casing: | String Type: 2ND, Hole Size: 6 in., Size: 4.5 in., Top: 5136 ft., Depth: 13342 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 3/3/2014 | Spud Date Is: | ACTUAL | Measured TD: | 6017 ft. | Measured PB depth: | 4700 ft. | True Vertical TD: | 5649 ft. | True Vertical PB depth: | 4676 ft. | Bottom Hole Location: | Sec:26 Twp: 10N 58W | Footage: 2021 FNL 1525 FWL | Log Types: | The CBL will be submitted with the Form 5 for the -01 wellbore. | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 75 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1575 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 635, Top: 0 ft., Bottom: 1575 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1575 ft., Depth: 6017 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: OPEN HOLE , Top: 5300 ft., Depth: 6000 ft., Bottom: 6000 ft., Sacks: 280, Method: RETAINER | Additional Cement: | String Type: OPEN HOLE , Top: 4700 ft., Depth: 5300 ft., Bottom: 5300 ft., Sacks: 300, Method: RETAINER | Additional Cement: | String Type: OPEN HOLE , Top: 4700 ft., Depth: 5400 ft., Bottom: 5400 ft., Sacks: 350, Method: RETAINER | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 10/22/2014 Measured TD: 13316 ft. Vertical TD: 5617 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 10/22/2014 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/10/2016 | Proposed Top PZ Location: | Sec:26 Twp: 10N 58W | Footage: 1912 FNL 1372 FWL | Bottom Hole Location: | Sec:23 Twp: 10N 58W | Footage: 100 FNL 1485 FWL | Proposed Depth/Form: | 13290 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-314 , Unit Acreage: 960, Drill Unit: All 23, N/2 26 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: , Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1565 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 719, Top: 0 ft., Bottom: 1565 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5906 ft., Weight: 29 , Citings Type: PLANNED | Cement: | Sacks: 433, Top: 0 ft., Bottom: 5906 ft. | Casing: | String Type: 2ND, Hole Size: 6 in., Size: 4.5 in., Top: 5000 ft., Depth: 13290 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 3/22/2014 | Spud Date: | 3/3/2014 | Spud Date Is: | ACTUAL | Measured TD: | 13316 ft. | Measured PB depth: | 13316 ft. | True Vertical TD: | 5617 ft. | True Vertical PB depth: | 5617 ft. | Top PZ Location: | Sec:26 Twp: 10N 58W | Footage: 2191 FNL 1594 FWL | Bottom Hole Location: | Sec:23 Twp: 10N 58W | Footage: 123 FNL 1472 FWL | Log Types: | LWD, Mud, RCBL
NOTE: Full set of logs run on Razor 26K-2306B | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 75 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1565 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 635, Top: 0 ft., Bottom: 1565 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5959 ft., Weight: 29 , Citings Type: ACTUAL | Cement: | Sacks: 690, Top: 1456 ft., Bottom: 5959 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 4914 ft., Depth: 13298 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 545, Top: 4914 ft., Bottom: 13298 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 1691 ft. | | N | N | HYGIENE | 3513 ft. | | N | N | SHARON SPRINGS | 5664 ft. | | N | N | NIOBRARA | 5675 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 10/22/2014 Interval Top: 5959 ft. Interval Bottom: 13316 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/19/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/25/2014 | Treatment End Date: | 7/3/2014 | Treatment Summary: | 40 stages: 78126 bbl XL Gel, 92781 bbl Linear Gel, 127714# 100 Mesh, 5476456# 16/30 Wh Sand, 1002 bbls 15% HCl, 34006 bbl Slickwater | Total fluid used in treatment (bbls): | 127804 | Max pressure during treatment (psi): | 8124 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 40 | Total acid used in treatment (bbls): | 1002 | Min frac gradient (psi/ft): | 0.80 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 30031 | Fresh water used in treatment (bbls): | 127804 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 5604170 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5662 ft. | Tubing Packer Depth: | 5662 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/22/2014 | Test Method: | Separator | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 86 | BBLS_OIL | 129 | BTU_GAS | 1405 | CALC_BBLS_H2O | 86 | CALC_BBLS_OIL | 129 | CALC_GOR | 388 | CALC_MCF_GAS | 50 | CASING_PRESS | 850 | GRAVITY_OIL | 35 | MCF_GAS | 50 | TUBING_PRESS | 390 |
| Perforation Data: | Interval Top: | 5959 ft. | # Of Holes: | 1440 | Interval Bottom: | 13316 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1481 |
Total Gas Produced (MCF) | 5782 |
GOR | 3904 |
GOR Determination | BOE |
Average BOE per Day | 6.785 |
Average MCFE per Day | 39.364 |
Federal Financial Assurance | i | |
|
|