| Material Handling and Spill Prevention | Form: (02A ) 400314825 9/28/2012 | Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado.
• Materials and fluids will be stored in a neat and orderly fashion.
• Waste will be collected regularly and disposed of at an offsite facility.
• Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff.
• Drip pans will be used during fueling and maintenance to contain spills or leaks.
• Cleanup of trash and discarded material will be done at the end of the work day.
• Cleanup will consist of monitoring the road, location and any other work areas.
• Material to be cleaned up includes trash, scrap, and contaminated soil.
|
| Storm Water/Erosion Control | Form: (02A ) 400314825 9/28/2012 | Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed. |
| Planning | Form: (02A ) 400314825 9/28/2012 | The Operator participates in the Colorado Oil & Gas Association Voluntary Baseline Groundwater Sampling Program.
|
| Storm Water/Erosion Control | Form: (02A ) 400428487 8/23/2013 | Stormwater management plans (SWMP) are in place to address construction, drilling
and operations associated with oil and gas development throughout the State of
Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving
the construction site. BMPs used will vary according to the location, and will remain
until the pad is reclaimed |
| Material Handling and Spill Prevention | Form: (02A ) 400428487 8/23/2013 | Spill Prevention Control and Countermeasures (SPCC) plans are in place to address
any possible spill associated with oil and gas operations throughout the State of
Colorado.
• Materials and fluids will be stored in a neat and orderly fashion.
• Waste will be collected regularly and disposed of at an offsite facility.
• Prompt cleanup is required of spills to minimize waste materials entering the
stormwater runoff.
• Drip pans will be used during fueling and maintenance to contain spills or leaks.
• Cleanup of trash and discarded material will be done at the end of the work day.
• Cleanup will consist of monitoring the road, location and any other work areas.
• Material to be cleaned up includes trash, scrap, and contaminated soil.
|
| Construction | Form: (02A ) 400428487 8/23/2013 | ALL CUTTINGS SHALL BE MIXED ON LOCATION UTILIZING THE SPECIALIZED CDU MIXING MACHINE WHERE THE CUTTINGS ARE MIXED WITH GEOZORB – AN ENGINEERED ABSORBENT ORGANIC MATERIAL, DRYLET MBB – A BIOREMEDIATION ADDITIVE FOR DECOMPOSITION OF HYDROCARBONS, AND BIOCOMPLETE – A BIOREMEDIATION ADDITIVE FOR DECOMPOSITION OF SALTS. THE STOCKPILE OF CUTTINGS ON LOCATION MIXED WITH GEOZORB AND ADDITIVES WILL BE SAMPLED AND TESTED ACCORDING TO SYMMETRY OILFIELD SOLUTIONS PROTOCOL (ATTACHED) AND COGCC TABLE 910-1. A PERMANENT RECORD OF THE LABORATORY ANALYSIS SHALL BE MAINTAINED BY THE OPERATOR. |
| General Housekeeping | Form: (04 ) 401003953 3/21/2016 | Trash was removed from the location as per document number 682500473. |
| Storm Water/Erosion Control | Form: (04 ) 401003953 3/21/2016 | Rill erosion on the northeastern end of the location was mitigated as per document number 682500473. |
| Storm Water/Erosion Control | Form: (04 ) 401003953 3/21/2016 | Wattles were repaired as per document number 682500473 |
| Storm Water/Erosion Control | Form: (02A ) 401114071 12/11/2016 | Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed. |
| Material Handling and Spill Prevention | Form: (02A ) 401114071 12/11/2016 | Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado.
• Materials and fluids will be stored in a neat and orderly fashion.
• Waste will be collected regularly and disposed of at an offsite facility.
• Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff.
• Drip pans will be used during fueling and maintenance to contain spills or leaks.
• Cleanup of trash and discarded material will be done at the end of the work day.
• Cleanup will consist of monitoring the road, location and any other work areas.
• Material to be cleaned up includes trash, scrap, and contaminated soil.
|