Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION430308Razor
26K Pad
FUNDARE RESOURCES OPERATING COMPANY LLC
10773
AC
3/1/2025
DJ HORIZONTAL NIOBRARA
16950
WELD  123
NESW 26 10N58W 6
430308View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401114071
11/29/2016
Within 30 days of approval of this Form 2A and prior to generating E&P drilling waste, the operator shall submit a Form 27 Remediation Workplan to John Axelson, East Colorado Environmental Supervisor, detailing the planned treatment of drilling waste
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02A )
400314825
9/28/2012
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado. • Materials and fluids will be stored in a neat and orderly fashion. • Waste will be collected regularly and disposed of at an offsite facility. • Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff. • Drip pans will be used during fueling and maintenance to contain spills or leaks. • Cleanup of trash and discarded material will be done at the end of the work day. • Cleanup will consist of monitoring the road, location and any other work areas. • Material to be cleaned up includes trash, scrap, and contaminated soil.
Storm Water/Erosion ControlForm: (02A )
400314825
9/28/2012
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed.
PlanningForm: (02A )
400314825
9/28/2012
The Operator participates in the Colorado Oil & Gas Association Voluntary Baseline Groundwater Sampling Program.
Storm Water/Erosion ControlForm: (02A )
400428487
8/23/2013
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed
Material Handling and Spill PreventionForm: (02A )
400428487
8/23/2013
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado. • Materials and fluids will be stored in a neat and orderly fashion. • Waste will be collected regularly and disposed of at an offsite facility. • Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff. • Drip pans will be used during fueling and maintenance to contain spills or leaks. • Cleanup of trash and discarded material will be done at the end of the work day. • Cleanup will consist of monitoring the road, location and any other work areas. • Material to be cleaned up includes trash, scrap, and contaminated soil.
ConstructionForm: (02A )
400428487
8/23/2013
ALL CUTTINGS SHALL BE MIXED ON LOCATION UTILIZING THE SPECIALIZED CDU MIXING MACHINE WHERE THE CUTTINGS ARE MIXED WITH GEOZORB – AN ENGINEERED ABSORBENT ORGANIC MATERIAL, DRYLET MBB – A BIOREMEDIATION ADDITIVE FOR DECOMPOSITION OF HYDROCARBONS, AND BIOCOMPLETE – A BIOREMEDIATION ADDITIVE FOR DECOMPOSITION OF SALTS. THE STOCKPILE OF CUTTINGS ON LOCATION MIXED WITH GEOZORB AND ADDITIVES WILL BE SAMPLED AND TESTED ACCORDING TO SYMMETRY OILFIELD SOLUTIONS PROTOCOL (ATTACHED) AND COGCC TABLE 910-1. A PERMANENT RECORD OF THE LABORATORY ANALYSIS SHALL BE MAINTAINED BY THE OPERATOR.
General HousekeepingForm: (04 )
401003953
3/21/2016
Trash was removed from the location as per document number 682500473.
Storm Water/Erosion ControlForm: (04 )
401003953
3/21/2016
Rill erosion on the northeastern end of the location was mitigated as per document number 682500473.
Storm Water/Erosion ControlForm: (04 )
401003953
3/21/2016
Wattles were repaired as per document number 682500473
Storm Water/Erosion ControlForm: (02A )
401114071
12/11/2016
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed.
Material Handling and Spill PreventionForm: (02A )
401114071
12/11/2016
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado. • Materials and fluids will be stored in a neat and orderly fashion. • Waste will be collected regularly and disposed of at an offsite facility. • Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff. • Drip pans will be used during fueling and maintenance to contain spills or leaks. • Cleanup of trash and discarded material will be done at the end of the work day. • Cleanup will consist of monitoring the road, location and any other work areas. • Material to be cleaned up includes trash, scrap, and contaminated soil.