Skip to Main Content

COGIS

Facility Detail

COGIS - LOCATION INFORMATION

Click image to view related facilities. RelatedClick image to view inspection information. InspView GIS GISClick image to view imaged documents for this well/facility. DocClick image to view facility COAs and BMPs. COAClick image to search for orders within this facility's section. Orders
Razor - #435421 InformationStatus: AC - 12/21/2023
Location ID:435421Location Name/No:Razor/26 Production
Facility Status:ACFacility Status Date:12/21/2023
Operator Name:WHITING OIL & GAS CORPORATIONOperator Number:96155
County:WELD  - #123Location:NESW 26 10N58W
Facility Type:LOCATIONLat/Long:40.808739 / -103.836811
Form 2A Document #:400514340Form 2A Expiration:12/12/2016
Location Inventory
Wells:  0Oil Tanks:  16Condensate Tanks:  1Water Tanks:  16Buried Produced Water Vaults:  0
Drilling Pits:  0Production Pits:  0Special Purpose Pits:  0Multi-Well Pits:  0Modular Large Volume Tanks:  0
Pump Jacks:  0Separators:  8Injection Pumps:  0Heat-Treaters:  0Cavity Pumps:  0
Gas Compressors:  3Gas or Diesel Motors:  0Electric Motors:  2Electric Generators:  1Fuel Tanks:  0
LACT Unit:  2Dehydrator Units:  0Vapor Recovery Unit:  0VOC Combustor:  2Flare:  2
Enclosed Combustion Devices:  0Meter/Sales Building:  0Pigging Station:  0
Other:  The approximate length of pipeline to be constructed is 2700 feet for the Razor 26I Pad, 1400 feet for the Razor 26J Pad, 150' for the Razor 26K Pad, 200' for the Razor 26L Pad. All displaced materials shall be placed back into the cleared route once construction is completed. Pipeline construction will not block or change the natural course of any drainage. The pipeline will be buried wherever possible. The pipeline will be buried a minimum of 30” below the surface at all locations. Pipeline trenches shall be maintained in order to correct settlement and erosion. The pipelines will be a 8” or 6” production and 6” or 4” test. All lines will be welded steel.
 
Related Tank Facilities
Sorry, no associated tank facilities could be found.
Related Pits
Sorry, no associated pits could be found.
Wells
Sorry, no associated wells could be found.
Off-Location Flowlines
Facility ID:  465033Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26J North Gas Lift LineStart Location ID:  435421Location:  NWSE 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  9/12/2014

Facility ID:  465034Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26J South Gas Lift LineStart Location ID:  435421Location:  NWSE 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  9/25/2014

Facility ID:  465037Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26K South Gas Lift LineStart Location ID:  435421Location:  NESW 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  9/24/2014

Facility ID:  465031Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26I North Gas Lift LineStart Location ID:  435421Location:  NESE 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  11/23/2014

Facility ID:  465035Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26L North Gas Lift LineStart Location ID:  435421Location:  NWSW 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  11/2/2014

Facility ID:  465032Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26I South Gas Lift LineStart Location ID:  435421Location:  NESE 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  11/23/2014

Facility ID:  465038Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26K North Gas Lift LineStart Location ID:  435421Location:  NESW 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  9/26/2014

Facility ID:  465036Operator Name:  FUNDARE RESOURCES OPERATING COMPANY LLC Status:  AC
Operator Flowline ID:  Razor 26L South Gas Lift LineStart Location ID:  435421Location:  NWSW 2610N 58W
Flowline Type:  Peripheral Piping Fluid Type:  Natural GasPipe Material:  Carbon SteelConstruction Date:  11/15/2014

Facility ID:  465029Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26J North Bulk Production LineStart Location ID:  433131Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  8/16/2014

Facility ID:  465030Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26L North Test Production LineStart Location ID:  434157Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/15/2014

Facility ID:  465010Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26L North Bulk Production LineStart Location ID:  434157Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/15/2014

Facility ID:  465011Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26K North Bulk Production LineStart Location ID:  430308Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  9/12/2014

Facility ID:  465026Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26J South Test Production LineStart Location ID:  433131Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  8/18/2014

Facility ID:  465027Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26L South Blowdown LineStart Location ID:  434157Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/23/2014

Facility ID:  466889Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26 CPB Produced Water LineStart Location ID:  435421Location:  NESW 2610N 58W
Flowline Type:  Process PipingFluid Type:  Produced WaterPipe Material:  OtherConstruction Date:  8/13/2019

Facility ID:  465028Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26I North Blowdown LineStart Location ID:  435160Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/21/2014

Facility ID:  465023Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26L South Bulk Production LineStart Location ID:  434157Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/23/2014

Facility ID:  465024Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26K South Bulk Production LineStart Location ID:  430308Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  9/13/2014

Facility ID:  465025Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26J North Test Production LineStart Location ID:  433131Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  8/16/2014

Facility ID:  465021Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26K South Test Production LineStart Location ID:  430308Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  9/13/2014

Facility ID:  465022Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26K South Blowdown LineStart Location ID:  430308Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  9/13/2014

Facility ID:  465017Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26I South Bulk Production LineStart Location ID:  435160Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/10/2014

Facility ID:  465018Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26K North Blowdown LineStart Location ID:  430308Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  9/12/2014

Facility ID:  465019Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26I South Blowdown LineStart Location ID:  435160Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/10/2014

Facility ID:  465020Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26L South Test Production LineStart Location ID:  434157Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/23/2014

Facility ID:  465016Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26J North Blowdown LineStart Location ID:  433131Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  8/16/2014

Facility ID:  465015Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26I South Test Production LineStart Location ID:  435160Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/10/2014

Facility ID:  465007Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26J South Bulk Production LineStart Location ID:  433131Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  8/18/2014

Facility ID:  465008Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26K North Test Production LineStart Location ID:  430308Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  9/12/2014

Facility ID:  465009Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26I North Bulk Production LineStart Location ID:  435160Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/21/2014

Facility ID:  465012Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26L North Blowdown LineStart Location ID:  434157Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/15/2014

Facility ID:  465013Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26J South Blowdown LineStart Location ID:  433131Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  8/18/2014

Facility ID:  465014Operator Name:  WHITING OIL & GAS CORPORATION Status:  AC
Operator Flowline ID:  Razor 26I North Test Production LineStart Location ID:  435160Location:  NESW 2610N 58W
Flowline Type:  Manifold PipingFluid Type:  MultiphasePipe Material:  Carbon SteelConstruction Date:  10/21/2014

Domestic Taps
Sorry, no domestic taps could be found.