Off-Location Flowlines |
Facility ID: 465033 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26J North Gas Lift Line | Start Location ID: 435421 | Location: NWSE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465034 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26J South Gas Lift Line | Start Location ID: 435421 | Location: NWSE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/25/2014 |
| |
Facility ID: 465037 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26K South Gas Lift Line | Start Location ID: 435421 | Location: NESW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/24/2014 |
| |
Facility ID: 465031 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26I North Gas Lift Line | Start Location ID: 435421 | Location: NESE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/23/2014 |
| |
Facility ID: 465035 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26L North Gas Lift Line | Start Location ID: 435421 | Location: NWSW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/2/2014 |
| |
Facility ID: 465032 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26I South Gas Lift Line | Start Location ID: 435421 | Location: NESE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/23/2014 |
| |
Facility ID: 465038 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26K North Gas Lift Line | Start Location ID: 435421 | Location: NESW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/26/2014 |
| |
Facility ID: 465036 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26L South Gas Lift Line | Start Location ID: 435421 | Location: NWSW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/15/2014 |
| |
Facility ID: 465029 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J North Bulk Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/16/2014 |
| |
Facility ID: 465030 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L North Test Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/15/2014 |
| |
Facility ID: 465010 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L North Bulk Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/15/2014 |
| |
Facility ID: 465011 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K North Bulk Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465026 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J South Test Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/18/2014 |
| |
Facility ID: 465027 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L South Blowdown Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/23/2014 |
| |
Facility ID: 466889 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26 CPB Produced Water Line | Start Location ID: 435421 | Location: NESW 2610N 58W |
Flowline Type: Process Piping | Fluid Type: Produced Water | Pipe Material: Other | Construction Date: 8/13/2019 |
| |
Facility ID: 465028 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I North Blowdown Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/21/2014 |
| |
Facility ID: 465023 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L South Bulk Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/23/2014 |
| |
Facility ID: 465024 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K South Bulk Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/13/2014 |
| |
Facility ID: 465025 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J North Test Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/16/2014 |
| |
Facility ID: 465021 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K South Test Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/13/2014 |
| |
Facility ID: 465022 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K South Blowdown Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/13/2014 |
| |
Facility ID: 465017 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I South Bulk Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/10/2014 |
| |
Facility ID: 465018 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K North Blowdown Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465019 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I South Blowdown Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/10/2014 |
| |
Facility ID: 465020 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L South Test Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/23/2014 |
| |
Facility ID: 465016 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J North Blowdown Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/16/2014 |
| |
Facility ID: 465015 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I South Test Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/10/2014 |
| |
Facility ID: 465007 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J South Bulk Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/18/2014 |
| |
Facility ID: 465008 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26K North Test Production Line | Start Location ID: 430308 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465009 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I North Bulk Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/21/2014 |
| |
Facility ID: 465012 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L North Blowdown Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/15/2014 |
| |
Facility ID: 465013 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J South Blowdown Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/18/2014 |
| |
Facility ID: 465014 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I North Test Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/21/2014 |
| |