Off-Location Flowlines |
Facility ID: 465031 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26I North Gas Lift Line | Start Location ID: 435421 | Location: NESE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/23/2014 |
| |
Facility ID: 465032 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26I South Gas Lift Line | Start Location ID: 435421 | Location: NESE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/23/2014 |
| |
Facility ID: 465032 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I South Gas Lift Line | Start Location ID: 435421 | Location: NESE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/23/2014 |
| |
Facility ID: 465028 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I North Blowdown Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/21/2014 |
| |
Facility ID: 465031 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I North Gas Lift Line | Start Location ID: 435421 | Location: NESE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/23/2014 |
| |
Facility ID: 465009 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I North Bulk Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/21/2014 |
| |
Facility ID: 465014 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I North Test Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/21/2014 |
| |
Facility ID: 465015 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I South Test Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/10/2014 |
| |
Facility ID: 465017 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I South Bulk Production Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/10/2014 |
| |
Facility ID: 465019 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26I South Blowdown Line | Start Location ID: 435160 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/10/2014 |
| |