Off-Location Flowlines |
Facility ID: 465033 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26J North Gas Lift Line | Start Location ID: 435421 | Location: NWSE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465034 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26J South Gas Lift Line | Start Location ID: 435421 | Location: NWSE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/25/2014 |
| |
Facility ID: 465034 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J South Gas Lift Line | Start Location ID: 435421 | Location: NWSE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/25/2014 |
| |
Facility ID: 465016 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J North Blowdown Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/16/2014 |
| |
Facility ID: 465025 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J North Test Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/16/2014 |
| |
Facility ID: 465026 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J South Test Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/18/2014 |
| |
Facility ID: 465029 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J North Bulk Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/16/2014 |
| |
Facility ID: 465033 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J North Gas Lift Line | Start Location ID: 435421 | Location: NWSE 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 9/12/2014 |
| |
Facility ID: 465007 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J South Bulk Production Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/18/2014 |
| |
Facility ID: 465013 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26J South Blowdown Line | Start Location ID: 433131 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 8/18/2014 |
| |