|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 12/16/2015 Measured TD: 9422 ft. Vertical TD: 9412 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 12/16/2015 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/28/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 10N 58W | Footage: 1988 FSL 1959 FEL | | Bottom Hole Location: | Sec:26 Twp: 10N 58W | Footage: 1938 FSL 2013 FEL | | Proposed Depth/Form: | 9508 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: AMZN , Formation: AMAZON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PCMB , Formation: PRECAMBRIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PNATK , Formation: PENNSYLVANIAN-ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 20.167 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 68 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1550 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 716, Top: 0 ft., Bottom: 1550 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 9500 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1076, Top: 0 ft., Bottom: 9500 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/10/2013 | | Spud Date: | 7/23/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 9422 ft. | Measured PB depth: | 8297 ft. | | True Vertical TD: | 9412 ft. | True Vertical PB depth: | 8288 ft. | | Top PZ Location: | Sec:26 Twp: 10N 58W | Footage: 1988 FSL 1959 FEL | | Bottom Hole Location: | Sec:26 Twp: 10N 58W | Footage: 1938 FSL 2013 FEL | | Log Types: | Mud, Triple Combo, Resistivity, FMI, RCBL | | Log Types: | | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 75 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 742, Top: 0 ft., Bottom: 1600 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 9404 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1263, Top: 150 ft., Bottom: 9404 ft., Determination Method: CALC | | Casing: | String Type: 1ST LINER, Hole Size: 4.875 in., Size: 4.75 in., Top: 5642 ft., Depth: 5684 ft., Weight: 16.4 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: , Bottom: , Determination Method: CALC | | Additional Cement: | String Type: 1ST , Top: 5661 ft., Depth: 5664 ft., Bottom: 5664 ft., Sacks: 52, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1607 ft. | | N | N | | HYGIENE | 3270 ft. | | N | N | | SHARON SPRINGS | 5565 ft. | | N | N | | NIOBRARA | 5568 ft. | | Y | N | | SKULL CREEK | 6508 ft. | | Y | N | | DAKOTA | 6695 ft. | | Y | N | | MORRISON | 6791 ft. | | Y | N | | ENTRADA | 6976 ft. | | Y | N | | LYONS | 7538 ft. | | Y | N | | WOLFCAMP | 7818 ft. | | N | N | | AMAZON | 7905 ft. | | N | N | | PENNSYLVANIAN | 8263 ft. | | N | N | | MORROW | 9035 ft. | | N | N | | PRECAMBRIAN | 9279 ft. | | N | N |
Formation PCMB Formation Classification: DSPW Status: AB - 10/28/2013 Interval Top: 9372 ft. Interval Bottom: 9382 ft.| Completed Information for Formation PRECAMBRIAN | | 1st Production Date: | 10/24/2013 | Choke Size: | | | Formation Name: | PRECAMBRIAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/28/2013 | Treatment End Date: | N/A | | Treatment Summary: | 160 bbls 3% KCl water | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/26/2013 | Test Method: | Swabbing | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 92 | | CALC_BBLS_H2O | 92 |
| | Perforation Data: | | Interval Top: | 9372 ft. | # Of Holes: | 61 | | Interval Bottom: | 9382 ft. | Hole Size: | 0.375 in. |
|
Formation AMZN Formation Classification: DSPW Status: CM - 10/2/2015 Interval Top: 7948 ft. Interval Bottom: 7962 ft.| Completed Information for Formation AMAZON | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | AMAZON | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 9/30/2014 | Treatment End Date: | 9/30/2014 | | Treatment Summary: | Drill out cemented BP @ 7938', perform acid job with 5000 gals acid and step rate injection test | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/1/2013 | Treatment End Date: | N/A | | Treatment Summary: | Swabbed. No treatment performed. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 205 | | CALC_BBLS_H2O | 205 | | CASING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 7948 ft. | # Of Holes: | 85 | | Interval Bottom: | 7962 ft. | Hole Size: | 0.375 in. |
|
Formation LYNS Formation Classification: DSPW Status: CM - 10/2/2015 Interval Top: 7544 ft. Interval Bottom: 7628 ft.| Completed Information for Formation LYONS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | LYONS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 9/30/2014 | Treatment End Date: | 9/30/2014 | | Treatment Summary: | Drill out cemented BP @ 7530', perform acid job with 5000 gals acid and Step Rate Test for injection test | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/12/2013 | Treatment End Date: | N/A | | Treatment Summary: | No treatment performed in Lower Lyons. Swabbed. Pump 54 bbls 3% KCl water on Upper Lyons. Swabbed. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 155 | | CALC_BBLS_H2O | 155 |
| | Perforation Data: | | Interval Top: | 7544 ft. | # Of Holes: | 219 | | Interval Bottom: | 7628 ft. | Hole Size: | 0.375 in. |
|
Formation DJINJ Formation Classification: DSPW Status: IJ - 12/16/2015 Interval Top: 6976 ft. Interval Bottom: 7962 ft.| Completed Information for Formation DENVER BASIN COMBINED DISPOSAL ZONE | | 1st Production Date: | 10/2/2015 | Choke Size: | | | Formation Name: | DENVER BASIN COMBINED DISPOSAL ZONE | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DJINJ. |
| | Perforation Data: | | Interval Top: | 6976 ft. | # Of Holes: | 438 | | Interval Bottom: | 7962 ft. | Hole Size: | 0.375 in. |
|
Formation ENRD Formation Classification: DSPW Status: CM - 10/2/2015 Interval Top: 6976 ft. Interval Bottom: 7002 ft.| Completed Information for Formation ENTRADA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | ENTRADA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 9/30/2014 | Treatment End Date: | 9/30/2014 | | Treatment Summary: | Perform acid job with 5000 gals acid and step rate injection test | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/18/2013 | Treatment End Date: | N/A | | Treatment Summary: | No treatment performed. Swabbed. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 231 | | CALC_BBLS_H2O | 231 |
| | Perforation Data: | | Interval Top: | 6976 ft. | # Of Holes: | 134 | | Interval Bottom: | 7002 ft. | Hole Size: | 0.375 in. |
|
Formation NBRR Formation Classification: SI Status: AB - 9/12/2014 Interval Top: 5661 ft. Interval Bottom: 5664 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/3/2014 | Treatment End Date: | 7/3/2014 | | Treatment Summary: | 1 Stage 20# XL Gel frac pumped with 1310# 40/70 and 65061# 20/40 sand, 24 bbls 15% HCl, 1513 bbls slickewter pumped. | | Total fluid used in treatment (bbls): | 1587 | Max pressure during treatment (psi): | 2705 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 50 | | Fresh water used in treatment (bbls): | 1513 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 66371 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/3/2014 | Test Method: | Flowback | | Hours Tested: | 17 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 50 | | CALC_BBLS_H2O | 71 | | CASING_PRESS | 800 |
| | Perforation Data: | | Interval Top: | 5661 ft. | # Of Holes: | 18 | | Interval Bottom: | 5664 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|