Off-Location Flowlines |
Facility ID: 464023 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347750_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 464024 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12335228_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 464025 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347754_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 457807 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 091220181 | Start Location ID: 428103 | Location: SESW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: | Construction Date: 4/17/2012 |
| |
Facility ID: 464026 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347751_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 464028 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347752_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/5/2019 |
| |
Facility ID: 464027 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12334663_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 464027 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12334663_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 457806 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 091220182 | Start Location ID: 428103 | Location: SESW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: | Construction Date: 4/1/2012 |
| |
Facility ID: 464029 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347749_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 464030 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347756_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 464031 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347757_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |
Facility ID: 464032 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347755_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/5/2019 |
| |
Facility ID: 464033 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12347753_FL | Start Location ID: 428103 | Location: SWSW 172N 65W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/15/2019 |
| |