Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35228
Well Classification: GW Status: SI - 7/1/2022
Well Name/No:MELBON RANCH #3B-17H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2022
FacilityID:428104LocationID:428103
County:WELD #123Location:SWSW 17 2N65W 6
Field:WATTENBERG - #90750Elevation:4958 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1310FSL  210 FWLLat/Long: 40.134980 / -104.696630Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.134988 / -104.696649Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2012
End Date: 6/16/2012
Reported: 9/6/2012
Days to report: 82
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2022             Measured TD: 11980 ft.    Vertical TD: 7145 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/7/2014
Proposed Top PZ Location:Sec:17 Twp: 2N 65W Footage: 1755 FSL  543 FWL
Bottom Hole Location:Sec:17 Twp: 2N 65W Footage: 1730 FSL  460 FEL
Proposed Depth/Form:11838 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 880 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 880 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7538 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 922, Top: 500 ft., Bottom: 7538 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11838 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/1/2012
Spud Date:3/14/2012Spud Date Is:ACTUAL
Measured TD:11980 ft.Measured PB depth:11959 ft.
True Vertical TD:7145 ft.True Vertical PB depth:7145 ft.
Top PZ Location:Sec:17 Twp: 2N 65WFootage: 1742 FSL  510 FWL
Bottom Hole Location:Sec:17 Twp: 2N 65WFootage: 1765 FSL  602 FWL
Log Types:No logs ran.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 926 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 926 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7522 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 0 ft., Bottom: 7510 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11980 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7073 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  SI - 7/1/2022                  Interval Top: 7586 ft.    Interval Bottom: 11788 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/4/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/11/2012Treatment End Date:6/16/2012
Treatment Summary:Frac stage 1. Pumped 1381 bbls. slick water and 2707bbls. X-link gel with 17,392# 40/70 sand, 220,378# 30/50 sand, and 12,840# 20/40 sand total 250,610#). Set CFP 1 at 11,644’. Frac stage 2. Pumped 1381 bbls. slick water and 2679 bbls. X-link gel with 17,394# 40/70 sand, 219,721# 30/50 sand, and 12,840# 20/40 sand, total 249,955#). Set CFP 2 at 11,403’. Frac stage 3. Pumped 1384 bbls. slick water and 2707 bbls. X-link gel with 17,216# 40/70 sand, 220,776# 30/50 sand, and 17,132# 20/40 sand, total 255,124#). Set CFP 3 at 11,165’. Frac stage 4. Pumped 1363 bbls. slick water and 2703 bbls. X-link gel with 17,311# 40/70 sand, 219,687# 30/50 sand, and 12,974# 20/40 sand, total 249,972#). Set CFP 4 at 10,921’. Frac stage 5. Pumped 1365 bbls. slick water and 2706 bbls. X-link gel with 17,472# 40/70 sand, 220,817# 30/50 sand, and 12,840# 20/40 sand, total 251,129#). Set CFP 5 at 10,680’. Frac stage 6. Pumped 1487 bbls. Slick water and 2715 bbls. X-link gel with 17,474# 40/70 sand, 219,611# 30/50 sand, and 19,824# 20/40 sand, total 256,876#). Set CFP 6 at 10,445’. Frac stage 7. Pumped 1367 bbls. slick water and 2745 bbls. X-link gel with 17,848# 40/70 sand, 221,731# 30/50 sand, and 21,596# 20/40 sand, total 261,175#). Set CFP 7 @ 10213’. Frac stage 8. Pumped 1357 bbls. slick water and 2735 bbls. X-link gel with 17,429# 40/70 sand, 223,303# 30/50 sand, and 12,840# 20/40 sand, total 253,572#). Set CFP 8 at 9,979’. Frac stage 9. Pumped 1348 bbls. slick water and 2695 bbls. X-link gel with 17,417# 40/70 sand, 219,586# 30/50 sand, and 12,840# 20/40 sand, total 249,843#). Set CFP 9 at 9,741’. Frac stage 10. . Pumped 1359 bbls. slick water and 2791 bbls. X-link gel with 17,720# 40/70 sand, 224,433# 30/50 sand, and 12,840# 20/40 sand, total 254,993#). Set CFP 10 at 9,498’.Frac stage 11. Pumped 1561 bbls. slick water and 3360 bbls. X-link gel with 20,654# 40/70 sand, 263,960# 30/50 sand, and 15,400# 20/40 sand, total 300,014#). Set CFP 11 at 9,220’. Frac stage 12. Pumped 1565 bbls. slick water and 3220 bbls. X-link gel with 20,718# 40/70 sand, 264,012# 30/50 sand, and 16,660# 40/70 sand, total 301,389#). Set CFP 15 at 8,107’. Frac stage 16. Pumped 1552 bbls. slick water and 3351 bbls. X-link gel with 20,918# 40/70 sand, 275,708# 30/50 sand, and 25,548# 20/40 sand, total 322,174#). Set CFP 16 at 7,827’. Frac stage 17. Pumped 1508 bbls. slick water and 3363 bbls. X-link gel with 20,822# 40/70 sand, 273,167# 30/50 sand, and 17,068# 20/40 sand, total 311,057#). Set CBP 6580’. Drill kill plug at 8580', CFP's at 7827', 8107', 8390', 8671', 8949', 9220', 9498', 10445', 10680', 10921', 11165', 11403', 11644'.
Total fluid used in treatment (bbls):77108Max pressure during treatment (psi):7118
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):77108Total flowback volume recovered (bbls):4687
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4655722Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 430
BBLS_OIL 243
BTU_GAS 1386
CALC_BBLS_H2O 430
CALC_BBLS_OIL 243
CALC_GOR 1909
CALC_MCF_GAS 464
CASING_PRESS 2550
GRAVITY_OIL 49
MCF_GAS 464
TUBING_PRESS 1850
Perforation Data:
Interval Top:7586 ft.# Of Holes:897
Interval Bottom:11788 ft.Hole Size:0.375 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
06/30/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No