Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2019 Measured TD: 11895 ft. Vertical TD: 7160 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/21/2014 | Proposed Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 799 FSL 553 FWL | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 775 FSL 460 FWL | Proposed Depth/Form: | 11828 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 880 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 198, Top: 0 ft., Bottom: 880 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7538 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 922, Top: 500 ft., Bottom: 7538 ft. | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11828 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 4/17/2012 | Spud Date: | 4/3/2012 | Spud Date Is: | ACTUAL | Measured TD: | 11895 ft. | Measured PB depth: | 11822 ft. | True Vertical TD: | 7160 ft. | True Vertical PB depth: | 7163 ft. | Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 803 FSL 740 FWL | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 833 S 701 E | Log Types: | No logs were ran | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 926 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 0 ft., Bottom: 926 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7597 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 590, Top: 0 ft., Bottom: 7597 ft., Determination Method: VISU | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11895 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7642 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2019 Interval Top: 7642 ft. Interval Bottom: 11556 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/27/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/11/2012 | Treatment End Date: | 6/15/2012 | Treatment Summary: | Frac stage 1. Pumped 1366 bbls. slick water and 3450
bbls. X-link gel with 17,204# 40/70 sand, 219,744# 30/50 sand, and 12,823# 20/40 sand,
total 249,771#).
Set CFP 1 at 11,322. Frac stage 2. Pumped 21 Bbls B?D fluid followed by 24 Bbls 15% HCL. Pumped 1,431 bbls. slick water and 2,765 bbls. X-link gel with 18,546# 40/70 sand, 221,845# 30/50 sand, and 12,840# 20/40 sand, total 253,231#).
Set CFP 2 at 11,087’. Frac stage 3. Pumped 2,085 bbls. slick water and 3,578
bbls. X-link gel with 17,267# 40/70 sand, 235,943# 30/50 sand, and 12,815# 20/40 sand,
total 266,025#).
Set CFP 3 at 10,834.’ Frac stage 4. Pumped 1,781 bbls. slick water and 3,054
bbls. X-link gel with 17,267# 40/70 sand, 221,286# 30/50 sand, and 12,865# 20/40 sand,
total 251,418#).
Set CFP 4 at 10,619’. Frac stage 5. Pumped 21 Bbls B/D fluid followed by 24
Bbls 15% HCL. Pumped 1,403 bbls. slick water and 2,704 bbls. X-link gel with 19,121#
40/70 sand, 220,141# 30/50 sand, and 12,840# 20/40 sand, total 252,101#).
Set CFP 5 at 10,383’. Frac stage 6. Pumped 1770 bbls. slick water and 3,063
bbls. X-link gel with 17,222# 40/70 sand, 219,505# 30/50 sand, and 12,718# 20/40 sand,
total 249,444#).
Set CFP 6 at 10,148'. Frac stage 7. Pumped 2,159 bbls. slick water and 3,019
bbls. X-link gel with 17,288# 40/70 sand, 219,939# 30/50 sand, and 18,788# 20/40 sand,
total 256,014#).
Set CFP 7 at 9,912’. Frac stage 8. Pumped 1,360 bbls. slick water and 2,733 bbls. X-link gel with 17,414# 40/70 sand, 220,121# 30/50 sand, and 12,840# 20/40 sand, total 250,375#).
Set CFP 8 at 9,679’. Frac stage 9. Pumped 1,360 bbls. slick water and 2,694
bbls. X-link gel with 17,815# 40/70 sand, 219,752# 30/50 sand, and 12,840# 20/40 sand,
total 250,406#).
Set CFP 9 at 9,443’. Frac stage 10. Pumped 1,336 bbls. slick water and 2,707
bbls. X-link gel with 17,275# 40/70 sand, 219,844# 30/50 sand, and 12,840# 20/40 sand,
total 249,958#).
Set CFP 10 at 9,207'. Frac stage 11. Pumped 1,755 bbls. slick water and 3,006
bbls. X-link gel with 17,327# 40/70 sand, 219,772# 30/50 sand, and 17,400# 20/40 sand,
total 254,499#).
Set CFP 11 at 8,971’. Frac stage 12. Pumped 1,559 bbls. slick water and 3,236
bbls. X-link gel with 20,765# 40/70 sand, 263,802# 30/50 sand, and 15,400# 20/40 sand,
total 299,967#).
Set CFP 12 at 8,695’. Frac stage 13. Pumped 2,055 bbls. slick water and 3,626 bbls.
X-link gel with 20,657# 40/70 sand, 264,306# 30/50 sand, and 22,276# 20/40 sand,total 307,239#).
Set CFP 13 at 8,421. Frac stage 14. Pumped 2,051 bbls. slick water and 3,666
bbls. X-link gel with 20,696# 40/70 sand, 267,064# 30/50 sand, and 18,012# 20/40 sand,
total 305,771#)..
Set CFP 14 at 8,148’. Frac stage 15. Pumped 1,545 bbls. slick water and 3,243
bbls. X-link gel with 20,697# 40/70 sand, 264,658# 30/50 sand, and 15,400# 20/40 sand,
total 300,755#).
Set CFP 15 at 7,879’. Frac stage 16. Formation opened with 3,070 psi. Pumped 1,494 bbls. slick water and 3,283
bbls. X-link gel with 20,726# 40/70 sand, 264,998# 30/50 sand, and 23,936# 20/40 sand.total 309,659#).
Set CBP "Kill Plug" at 6,410'.
Drill out CBP kill plug at 6410'. Drilled out CFP's as follows: 7879', 8148', 8421', 8695', 8971', 9207', 9443', 9679', 9912'. Drill CFP's at drill out plug at 10148' and plug at 10383', 10619', 10854', 11087', 11322'.
| Total fluid used in treatment (bbls): | 72082 | Max pressure during treatment (psi): | 7202 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 16 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.00 | Recycled water used in treatment (bbls): | 72082 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 4288581 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 448 | BBLS_OIL | 138 | BTU_GAS | 1386 | CALC_BBLS_H2O | 448 | CALC_BBLS_OIL | 138 | CALC_GOR | 572 | CALC_MCF_GAS | 79 | CASING_PRESS | 2650 | GRAVITY_OIL | 49 | MCF_GAS | 79 | TUBING_PRESS | 1450 |
| Perforation Data: | Interval Top: | 7642 ft. | # Of Holes: | 872 | Interval Bottom: | 11556 ft. | Hole Size: | 0.375 in. |
|
|