|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/17/2019 Measured TD: 12113 ft. Vertical TD: 7165 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/17/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/30/2020 | Proposed Top PZ Location: | Sec:20 Twp: 2N 65W | Footage: 7 FNL 471 FWL | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 29 FSL 465 FEL | Proposed Depth/Form: | 12133 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED | Cement: | Sacks: 78, Top: 0 ft., Bottom: 98 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2383 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 978, Top: 0 ft., Bottom: 2383 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12133 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1681, Top: , Bottom: 12133 ft. |
| | |
Wellbore Completed | Completion Date: | 11/15/2018 | Spud Date: | 9/22/2018 | Spud Date Is: | ACTUAL | Measured TD: | 12113 ft. | Measured PB depth: | 12088 ft. | True Vertical TD: | 7165 ft. | True Vertical PB depth: | 7165 ft. | Top PZ Location: | Sec:20 Twp: 2N 65W | Footage: 7 FNL 471 FWL | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 29 S 465 E | Log Types: | MUD, MWD/LWD, CBL (DIL in 123-22921, IND in 123-18951) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 78, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2389 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 965, Top: 0 ft., Bottom: 2439 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12101 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1520, Top: 2511 ft., Bottom: 12113 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4573 ft. | | N | N | SHANNON | 5205 ft. | | N | N | TEEPEE BUTTES | 6322 ft. | | N | N | SHARON SPRINGS | 7505 ft. | | N | N | NIOBRARA | 7599 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 2/17/2019 Interval Top: 7706 ft. Interval Bottom: 12076 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/7/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 12/3/2018 | Treatment End Date: | 12/9/2018 | Treatment Summary: | 1473269 bbls of water, 1587 bbls of additives (FRP-4CS, ACI-97, ASF-67), 171 bbls of HCL, 4474 bbls of recycled water in a 27 stage frac with 3964260 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 1479501 | Max pressure during treatment (psi): | 8799 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 27 | Total acid used in treatment (bbls): | 171 | Min frac gradient (psi/ft): | 0.89 | Recycled water used in treatment (bbls): | 4474 | Total flowback volume recovered (bbls): | 9040 | Fresh water used in treatment (bbls): | 1474856 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3964260 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7414 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/17/2019 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 115 | BBLS_OIL | 192 | BTU_GAS | 1351 | CALC_BBLS_H2O | 115 | CALC_BBLS_OIL | 192 | CALC_GOR | 3653 | CALC_MCF_GAS | 701 | CASING_PRESS | 2000 | GRAVITY_OIL | 49 | MCF_GAS | 701 | TUBING_PRESS | 950 |
| Perforation Data: | Interval Top: | 7706 ft. | # Of Holes: | 648 | Interval Bottom: | 12076 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3317 |
Total Gas Produced (MCF) | 86061 |
GOR | 25945 |
GOR Determination | MCFE |
Average BOE per Day | 49.596 |
Average MCFE per Day | 287.658 |
Federal Financial Assurance | i | |
|
|