| Off-Location Flowlines |
| Facility ID: 478450 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12332576_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 6/4/2013 |
| |
| Facility ID: 478450 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12332576_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 6/4/2013 |
| |
| Facility ID: 478452 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12322840_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 7/26/2005 |
| |
| Facility ID: 478452 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12322840_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 7/26/2005 |
| |
| Facility ID: 478451 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12330591_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 5/11/2010 |
| |
| Facility ID: 478451 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12330591_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 5/11/2010 |
| |
| Facility ID: 478449 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12317032_FL | Start Location ID: 336608 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 6/13/1993 |
| |
| Facility ID: 478449 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12317032_FL | Start Location ID: 336608 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 6/13/1993 |
| |
| Facility ID: 478448 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12316581_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 6/13/1993 |
| |
| Facility ID: 478448 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
| Operator Flowline ID: 12316581_FL | Start Location ID: 332739 | Location: NWSW 103N 65W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 6/13/1993 |
| |