|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/22/2025 Measured TD: 7854 ft. Vertical TD: 7744 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/22/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/21/2015 | | Proposed Top PZ Location: | Sec:10 Twp: 3N 65W | Footage: 2594 FNL 44 FWL | | Bottom Hole Location: | Sec:10 Twp: 3N 65W | Footage: 2601 FNL 42 FWL | | Proposed Depth/Form: | 7816 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7816 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 6732 ft., Bottom: 7816 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/4/2013 | | Spud Date: | 5/30/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7854 ft. | Measured PB depth: | 7818 ft. | | True Vertical TD: | 7744 ft. | True Vertical PB depth: | 7708 ft. | | Top PZ Location: | Sec:10 Twp: 3N 65W | Footage: 2594 FNL 44 FWL | | Bottom Hole Location: | Sec:10 Twp: 3N 65W | Footage: 2601 FNL 42 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 757 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 399, Top: 0 ft., Bottom: 757 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7843 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 355, Top: 3500 ft., Bottom: 7854 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 3456 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 232, Top: 0 ft., Bottom: 3500 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4470 ft. | | | | | NIOBRARA | 6976 ft. | | | | | CODELL | 7254 ft. | | | | | GREENHORN | 7317 ft. | | | | | J SAND | 7705 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/22/2025 Interval Top: 7723 ft. Interval Bottom: 7753 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/4/2013 | Treatment End Date: | 6/30/2013 | | Treatment Summary: | Frac'd the J Sand with 150,800# 30/50 and 145,364 gals SLF. 07-04-13
| | Total fluid used in treatment (bbls): | 3223 | Max pressure during treatment (psi): | 5140 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.73 | | Recycled water used in treatment (bbls): | 3223 | Total flowback volume recovered (bbls): | 292 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 150800 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7723 ft. | # Of Holes: | 75 | | Interval Bottom: | 7753 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/24/2013 Interval Top: 7254 ft. Interval Bottom: 7270 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/4/2013 | Treatment End Date: | 7/4/2013 | | Treatment Summary: | Set CFP @ 7310'. 07-04-13
Frac'd the Codell with 149,340# 30/50 and 148,558 gals SLF . 07-04-13
| | Total fluid used in treatment (bbls): | 3537 | Max pressure during treatment (psi): | 5507 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | 3537 | Total flowback volume recovered (bbls): | 292 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 149340 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7254 ft. | # Of Holes: | 48 | | Interval Bottom: | 7270 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/2/2013 Interval Top: 6978 ft. Interval Bottom: 7753 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/2/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 6900'. 07-24-13
Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 07-26-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7721 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/2/2013 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 30 | | BTU_GAS | 1304 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 14300 | | CALC_MCF_GAS | 429 | | CASING_PRESS | 895 | | GRAVITY_OIL | 56 | | MCF_GAS | 429 | | TUBING_PRESS | 533 |
| | Perforation Data: | | Interval Top: | 6978 ft. | # Of Holes: | 219 | | Interval Bottom: | 7753 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/22/2025 Interval Top: 6978 ft. Interval Bottom: 7270 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6978 ft. | # Of Holes: | 144 | | Interval Bottom: | 7270 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/24/2013 Interval Top: 6978 ft. Interval Bottom: 7046 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/4/2013 | Treatment End Date: | 7/1/2013 | | Treatment Summary: | Set CFP @ 7100'. 07-04-13
Frac'd the Niobrara with 149,920# 30/50 and 146,112 gals SLF. 07-04-13
| | Total fluid used in treatment (bbls): | 3479 | Max pressure during treatment (psi): | 6328 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.99 | | Recycled water used in treatment (bbls): | 3479 | Total flowback volume recovered (bbls): | 292 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 149920 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6978 ft. | # Of Holes: | 96 | | Interval Bottom: | 7046 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/22/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 15 |
| Total Gas Produced (MCF) | 89 |
| GOR | 5933 |
| GOR Determination | BOE |
| Average BOE per Day | 0.083 |
| Average MCFE per Day | 0.489 |
| Federal Financial Assurance | i | |
|
|