|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/13/2024 Measured TD: 7280 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/13/2024 | | Wellbore Permit | | | Permit #: | 19921835 | Expiration Date: | 4/3/1993 | | Proposed Depth/Form: | 7185 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SW |
| | |
| Wellbore Completed | | Completion Date: | 6/13/1993 | | Spud Date: | 1/12/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7280 ft. | Measured PB depth: | 7233 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SP; CDL/CNL BOND | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 530 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 530 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7261 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 6450 ft., Bottom: 7280 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4960 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 496, Top: 3860 ft., Bottom: 4960 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4381 ft. | | N | N | | BENTONITE | 4521 ft. | | N | N | | NIOBRARA | 6840 ft. | | N | N | | FORT HAYS | 7111 ft. | | N | N | | CODELL | 7134 ft. | | N | N | | GREENHORN | 7194 ft. | | N | N |
Formation CODL Formation Classification: OG Status: CM - 6/21/2012 Interval Top: 7134 ft. Interval Bottom: 7150 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/13/1993 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2012 | | Treatment Summary: | Re-frac w/ 2699 bbls frac fluid and 251,160 # sand | | Formation Treatment | | Treatment Date: | 9/16/2008 | | Treatment Summary: | CODL REFRAC & RECOMPLETION. REFRAC'D CODL W/ 104,118 GAL 28# VISTAR CROSS LINKED GEL CONTAINING 230,198# SAND. 9/16/08. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 34 | | BTU_GAS | 1339 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 4559 | | CALC_MCF_GAS | 155 | | CASING_PRESS | 530 | | GRAVITY_OIL | 61 | | MCF_GAS | 155 | | TUBING_PRESS | 229 |
| | Perforation Data: | | Interval Top: | 7134 ft. | # Of Holes: | 100 | | Interval Bottom: | 7150 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OG Status: AB - 8/13/2024 Interval Top: 6858 ft. Interval Bottom: 7150 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/13/1993 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/13/1993 | | Treatment Summary: | NB&CD COMMINGLE.REMOVE BP @ 7110 ON 3/17/2004. IN JUNE 1993:6858-7149': FRAC W/383,000# 20/40 SAND IN 2,166 GALS X-LINKED APOLLO FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7115 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/21/2012 | Test Method: | Flow | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 13 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 12154 | | CALC_MCF_GAS | 158 | | CASING_PRESS | 479 | | GRAVITY_OIL | 60 | | MCF_GAS | 158 | | TUBING_PRESS | 169 |
| | Perforation Data: | | Interval Top: | 6858 ft. | # Of Holes: | 234 | | Interval Bottom: | 7150 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 6/21/2012 Interval Top: 6858 ft. Interval Bottom: 7060 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/13/1993 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/19/2012 | | Treatment Summary: | Re-frac w/3160 bbks frac fluid and 251,680 # sand | | Formation Treatment | | Treatment Date: | 6/13/1993 | | Treatment Summary: | FRAC'D NIOBRARA (6870-7060) W/ 116,500 GAL FRAC FLUID AND 200,080# SAND, 3/1/04. SET BP 02/25/2004. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6858 ft. | # Of Holes: | 126 | | Interval Bottom: | 7060 ft. | Hole Size: | 38 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 2/21/2002 Interval Top: 4482 ft. Interval Bottom: 4492 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/13/1993 | | Treatment Summary: | SET RBP @ 4590 PRESSURE TEST. SET PKR @ 4352. PULL PKR. SQUEEZE W/50 SXS. DRILL OUT CMT. REMOVE RBP. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SUSX. |
| | Perforation Data: | | Interval Top: | 4482 ft. | # Of Holes: | | | Interval Bottom: | 4492 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|