| | Goetzel - #449015 Information | Status: AC - 11/14/2025 |
| | Location ID: | 449015 | Location Name/No: | Goetzel/7-29 Pad (Click Location Name for Water Production Data) | | Facility Status: | AC | Facility Status Date: | 11/14/2025 | | Operator Name: | PDC ENERGY INC | Operator Number: | 69175 | | County: | WELD - #123 | Location: | SWNE 29 6N66W | | Facility Type: | LOCATION | Lat/Long: | 40.460569 / -104.801189 | | Basin: | DENVER (DJ) BASIN | | | | Form 2A Document #: | 401129755 | Form 2A Expiration: | 1/25/2020 |
| | Location Inventory | | Wells: 12 | Oil Tanks: 19 | Condensate Tanks: 0 | Water Tanks: 2 | Buried Produced Water Vaults: 0 | | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 2 | | Pump Jacks: 0 | Separators: 25 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | | Gas Compressors: 2 | Gas or Diesel Motors: 0 | Electric Motors: 0 | Electric Generators: 1 | Fuel Tanks: 0 | | LACT Unit: 4 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 1 | Flare: 0 | | Enclosed Combustion Devices: 0 | Meter/Sales Building: 0 | Pigging Station: 0 | | Other: 1 inch, 2 inch, 3 inch, schedule 40/80/160 bare and fusion bonded epoxy, threaded and welded. water, oil, gas.
4 inch, 6 inch schedule 40/80 bare and fusion bonded epoxy, welded, water, oil, gas.
3 inch 4 inch poly welded / water or oil
6 inch, 8 inch, 10 inch schedule 10/20/40 welded, oil and combustion vapors.
Flowlines 3, 4, 6, 8" fusion bonded epoxy and welded scheduled 10/40/80/160 steel.
Synergy anticipates pipeline to this location and all future locations to eliminate trucks on road.
|
| | | | Related Tank Facilities | | Sorry, no associated tank facilities could be found. |
| | Related Pits | | Sorry, no associated pits could be found. |
| | | Off-Location Flowlines | | Sorry, no off-location flowlines could be found. |
| | Domestic Taps | | Sorry, no domestic taps could be found. |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|