Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION449015Goetzel
7-29 Pad
PDC ENERGY INC
69175
AC
11/14/2025
BRACEWELL
7487
WELD  123
SWNE 29 6N66W 6
449015View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401129755
1/26/2017
Planning : 604.c(2)M. Fencing: A meeting with the surface owner will determine a fencing plan. And after this discussion with surface owner, we will not be doing fencing at this location.
PlanningForm: (02A )
401129755
1/26/2017
Planning: 804. Visual Impacts: All long term facility structures will be painted a color that enables the facilities to blend in with the natural background color of the landscape, as seen from a viewing distance and location typically used by the public. Maintain appearance with garbage clean-up; a trash bin will be located on site to accumulate waste by the personnel drilling the wells. Site will have unused equipment, trash and junk removed immediately.
PlanningForm: (02A )
401129755
1/26/2017
Planning: 604.c.(2)N. Control of fire hazards: All material that is considered a fire hazard shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API IRP 500 and will comply with the current national electrical code.
Traffic controlForm: (02A )
401129755
1/26/2017
Traffic Control: 604.c.(2)S. Access Roads: The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access at all times. Traffic will be routed to minimize local interruption. Dust control measures will also be utilized.
Traffic controlForm: (02A )
401129755
1/26/2017
RULE 604.c.(2)D: If required by the local government, a traffic plan shall be coordinated with the local jurisdiction prior to commencement of move in and rig up. Any subsequent modification to the traffic plan must be coordinated with the local jurisdiction. Our access permit to location is our notification to Weld County, the city of Greeley, or additional municipality if necessary we need for approved traffic routs, and traffic control. All Traffic plans are approved per our access permit, part of the access permitting process.
General HousekeepingForm: (02A )
401129755
1/26/2017
604.c.(2)P. Trash Removal: All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as applicable.
Material Handling and Spill PreventionForm: (02A )
401129755
1/26/2017
604.c.(2)F. Leak Detention Plan: Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR 112.
Material Handling and Spill PreventionForm: (02A )
401129755
1/26/2017
604.c.(2)R Tank Specifications: Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues, and recorded inspections are conducted once a month.
ConstructionForm: (02A )
401129755
1/26/2017
Construction: 604.c.(3)B. Berm Construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition. Secondary containment devices shall be sufficiently impervious to contain any spilled or released material. Tertiary containment, such as an earthen berm, will be installed around production facilities.
ConstructionForm: (02A )
401129755
1/26/2017
803 Light sources during all phases of operations will be directed downwards and away from occupied structures where possible. Once the drilling and completion rigs leave the site, there will be no permanently installed lighting on site. Lighting shall be mounted at compressor stations on a pole or building and directed downward to illuminate key areas within the facility, while minimizing the amount of light projected outside the facility.
ConstructionForm: (02A )
401129755
1/26/2017
604.c.(2).Q. All guy line anchors left buried for future use shall be identified by a marker of bright color not less than four (4) feet in height and not greater than one (1) foot east of the guy line anchor.
ConstructionForm: (02A )
401129755
1/26/2017
604.c.(2).E. This will be a multi-well pad.
Noise mitigationForm: (02A )
401129755
1/26/2017
604.c.(2)A. Sound walls and/or hay bales will be used where necessary to surround the well site during drilling operations.
Odor mitigationForm: (02A )
401129755
1/26/2017
Rule 805: Oil & gas facilities and equipment shall be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare.
Drilling/Completion OperationsForm: (02A )
401129755
1/26/2017
604.c.(2).O. Drilling and Completion-All loadlines shall be bullplugged or capped.
Drilling/Completion OperationsForm: (02A )
401129755
1/26/2017
604.c.(2).K. Pit level Indicators - For the rig pits (steel tanks) we utilize the Pason PVT (Pit Volume Totalizer) system in conjunction with the EDR (Electronic Depth Recorder) systems on both rigs which incorporate digital recording of pit volumes, settable alarms for gain and loss so we are able to track the pit volumes. These items are standard on a 5K system which is what we are permitting for.
Drilling/Completion OperationsForm: (02A )
401129755
1/26/2017
Synergy will comply with all MLVT policies and requirements for this pad.
Final ReclamationForm: (02A )
401129755
1/26/2017
Final Reclamation: 604.c.(2)T. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. Identification of plugged and abandoned wells will be identified pursuant to 319.a.(5)
Final ReclamationForm: (02A )
401129755
1/26/2017
604.c.(2).U. Final Reclamation-The operator shall identify the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). The operator shall also inscribe or imbed the well number and date of plugging upon the permanent monument.