Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44143
Well Classification: OW Status: SI - 10/1/2025
Well Name/No:Goetzel #5C-30-M
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2025
FacilityID:449085LocationID:449015
County:WELD #123Location:SWNE 29 6N66W 6
Field:WATTENBERG - #90750Elevation:4728 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2033FNL  2446 FELLat/Long: 40.460734 / -104.801188Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.460734 / -104.801189Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/25/2017
End Date: 8/1/2017
Reported: 8/30/2017
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 10/1/2025             Measured TD: 15775 ft.    Vertical TD: 7081 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 10/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/30/2019
Proposed Top PZ Location:Sec:29 Twp: 6N 66W Footage: 1902 FNL  2505 FWL
Bottom Hole Location:Sec:30 Twp: 6N 66W Footage: 1845 FNL  150 FWL
Proposed Depth/Form:15476 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1934 , Unit Acreage: 1039, Drill Unit: Sec 29:W2,Sec 30:All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15818 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1970, Top: 0 ft., Bottom: 15818 ft.

Wellbore Completed
Completion Date:5/13/2017
Spud Date:3/5/2017Spud Date Is:ACTUAL
Measured TD:15775 ft.Measured PB depth:15712 ft.
True Vertical TD:7081 ft.True Vertical PB depth:7082 ft.
Top PZ Location:Sec:29 Twp: 6N 66WFootage: 1924 FNL  2382 FWL
Bottom Hole Location:Sec:30 Twp: 6N 66WFootage: 1837 FNL  127 FWL
Log Types:MWD/LWD, CBL, Mud, (Resistivity on 123-44136).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 0 ft., Bottom: 35 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1740 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1740 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15763 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2125, Top: 260 ft., Bottom: 15645 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3517 ft.NN
SUSSEX4180 ft.NN
SHANNON4583 ft.NN
SHARON SPRINGS6730 ft.NN
NIOBRARA6765 ft.NN
CODELL7012 ft.NN
FORT HAYS7050 ft.NN
CARLILE7097 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/15/2018                 Interval Top: 9850 ft.    Interval Bottom: 10550 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/15/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 9850'-10550'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9850 ft.# Of Holes:1404
Interval Bottom:10550 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/15/2018                 Interval Top: 8650 ft.    Interval Bottom: 11935 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/15/2018Treatment End Date:N/A
Treatment Summary:Producing Intervals: 8650'-8895'; 9600'-9850'; 11700'-11935'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8650 ft.# Of Holes:1404
Interval Bottom:11935 ft.Hole Size:0.46 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/15/2018                 Interval Top: 8410 ft.    Interval Bottom: 11700 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/15/2018Treatment End Date:N/A
Treatment Summary:Producing Intervals: 8410'-8650'; 11280'-11700'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8410 ft.# Of Holes:1404
Interval Bottom:11700 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/15/2018                 Interval Top: 7669 ft.    Interval Bottom: 15593 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/15/2018Treatment End Date:N/A
Treatment Summary:Producing Intervals: 7669'-8410'; 8895'-9600'; 10550'-11280'; 11935'-15593'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7669 ft.# Of Holes:1404
Interval Bottom:15593 ft.Hole Size:0.46 in.

Formation NFCC                     Formation Classification:  OW                     Status:  SI - 10/1/2025                 Interval Top: 7669 ft.    Interval Bottom: 15593 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:10/4/2017Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/25/2017Treatment End Date:7/31/2017
Treatment Summary:Plug and perf completion type. 39 stages; 238962 total bbls fluid pumped: 238441 bbls slickwater and gel, 521 bbls 15% HCL acid; 7751477 lbs. proppant (100+40/70+30/50 white sand) pumped.
Total fluid used in treatment (bbls):238962Max pressure during treatment (psi):7963
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):521Min frac gradient (psi/ft):1.04
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):239
Fresh water used in treatment (bbls):238441Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7751477Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6479 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/6/2017Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 137
BBLS_OIL 486
BTU_GAS 1330
CALC_BBLS_H2O 137
CALC_BBLS_OIL 486
CALC_GOR 1247
CALC_MCF_GAS 606
GRAVITY_OIL 48
MCF_GAS 606
TUBING_PRESS 1867
Perforation Data:
Interval Top:7669 ft.# Of Holes:1404
Interval Bottom:15593 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)599
Total Gas Produced (MCF)1535
GOR2562
GOR DeterminationBOE
Average BOE per Day2.370
Average MCFE per Day13.757

 Federal Financial Assurance  i 

 Tribal Well  i No