Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44136
Well Classification: OW Status: SI - 8/1/2024
Well Name/No:Goetzel #30C-30-M
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2024
FacilityID:449078LocationID:449015
County:WELD #123Location:SWNE 29 6N66W 6
Field:WATTENBERG - #90750Elevation:4729 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1833FNL  2445 FELLat/Long: 40.461283 / -104.801183Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.461282 / -104.801184Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/15/2017
End Date: 6/22/2017
Reported: 9/1/2017
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 8/1/2024             Measured TD: 15711 ft.    Vertical TD: 7083 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/30/2019
Proposed Top PZ Location:Sec:29 Twp: 6N 66W Footage: 299 FNL  2592 FWL
Bottom Hole Location:Sec:30 Twp: 6N 66W Footage: 307 FNL  510 FWL
Proposed Depth/Form:15694 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 590, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 464, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15694 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1964, Top: 0 ft., Bottom: 15694 ft.

Wellbore Completed
Completion Date:4/1/2017
Spud Date:2/25/2017Spud Date Is:ACTUAL
Measured TD:15711 ft.Measured PB depth:15650 ft.
True Vertical TD:7083 ft.True Vertical PB depth:7084 ft.
Top PZ Location:Sec:29 Twp: 6N 66WFootage: 289 FNL  2499 FWL
Bottom Hole Location:Sec:30 Twp: 6N 66WFootage: 310 FNL  402 FWL
Log Types:MWD, CBL, Mud, Resistivity
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1741 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1741 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15695 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2075, Top: 0 ft., Bottom: 15695 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3625 ft.NN
SUSSEX4180 ft.NN
SHANNON4825 ft.NN
SHARON SPRINGS6951 ft.NN
NIOBRARA6993 ft.NN
FORT HAYS7509 ft.NN
CODELL7602 ft.NN
CARLILE9800 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/25/2018                 Interval Top: 9800 ft.    Interval Bottom: 10923 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/25/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 9800'-10923'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9800 ft.# Of Holes:1332
Interval Bottom:10923 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/25/2018                 Interval Top: 8486 ft.    Interval Bottom: 8699 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/25/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 8486'-8699'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8486 ft.# Of Holes:1332
Interval Bottom:8699 ft.Hole Size:0.46 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  SI - 8/1/2024                  Interval Top: 7777 ft.    Interval Bottom: 15524 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:8/22/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/15/2017Treatment End Date:6/22/2017
Treatment Summary:Plug and perf completion type. 37 stages; 191780 total bbls fluid pumped: 191720 bbls slickwater and gel, 60 bbls 15% HCL acid; 6526302 lbs. proppant (100+40/70+30/50 white sand) pumped.
Total fluid used in treatment (bbls):191780Max pressure during treatment (psi):7930
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):28873
Fresh water used in treatment (bbls):191720Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6526302Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7242 ft.
Tubing Packer Depth:7220 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 275
BBLS_OIL 592
BTU_GAS 1330
CALC_BBLS_H2O 275
CALC_BBLS_OIL 592
CALC_GOR 1699
CALC_MCF_GAS 1006
GRAVITY_OIL 48
MCF_GAS 1006
TUBING_PRESS 1542
Perforation Data:
Interval Top:7777 ft.# Of Holes:1332
Interval Bottom:15524 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/25/2018                 Interval Top: 7777 ft.    Interval Bottom: 15524 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/25/2018Treatment End Date:N/A
Treatment Summary:Producing Intervals: 7777'-8486'; 8699'-9800'; 10923'-15524'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7777 ft.# Of Holes:1332
Interval Bottom:15524 ft.Hole Size:0.46 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
11/24/2025
Defined Inactive (SI )YDefined Inactive
07/31/2024
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No