Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38489
Well Classification: OW Status: PR - 10/1/2017
Well Name/No:Razor #26I-2314B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2017
FacilityID:435165LocationID:435160
County:WELD #123Location:NESE 26 10N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4713 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2167FSL  729 FELLat/Long: 40.808317 / -103.825211Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.808315 / -103.825210Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/18/2014
End Date: 9/25/2014
Reported: 10/21/2014
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2017             Measured TD: 14060 ft.    Vertical TD: 5653 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/22/2015
Proposed Top PZ Location:Sec:26 Twp: 10N 58W Footage: 2151 FNL  1053 FEL
Bottom Hole Location:Sec:23 Twp: 10N 58W Footage: 100 FNL  825 FEL
Proposed Depth/Form:13551 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-314 , Unit Acreage: 960, Drill Unit: S 23:All,S 26:N/2
Casing:String Type: CONDUCTOR, Hole Size: 16.063 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 719, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6200 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 433, Top: 0 ft., Bottom: 6200 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5187 ft., Depth: 13551 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/6/2014
Spud Date:4/24/2014Spud Date Is:ACTUAL
Measured TD:14060 ft.Measured PB depth:13949 ft.
True Vertical TD:5653 ft.True Vertical PB depth:5654 ft.
Top PZ Location:Sec:26 Twp: 10N 58WFootage: 2433 FSL  968 FEL
Bottom Hole Location:Sec:23 Twp: 10N 58WFootage: 117 FNL  834 FEL
Log Types:LWD/Mud/CBL/(IND/Triple Combo in 123-37495)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1579 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 0 ft., Bottom: 1579 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6037 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 592 ft., Bottom: 6037 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5031 ft., Depth: 14040 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 605, Top: 5031 ft., Bottom: 14040 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PIERRE1670 ft.NN
HYGIENE3312 ft.NN
SHARON SPRINGS5628 ft.NN
NIOBRARA5636 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2017                 Interval Top: 6364 ft.    Interval Bottom: 13783 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/27/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/18/2014Treatment End Date:9/25/2014
Treatment Summary:40-stage Frac: 77691 bbls ClearStar XL Gel; 12107 bbls ClearStar Linear Gel; 5872981# 20/40 Wh snd, 131360# 40/70 Wh snd, 448 bbls 28% HCl, 31700 bbls Slickwater.
Total fluid used in treatment (bbls):121946Max pressure during treatment (psi):8100
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):448Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):15374
Fresh water used in treatment (bbls):121498Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6004341Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5640 ft.
Tubing Packer Depth:5640 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/26/2014Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 574
BBLS_OIL 651
BTU_GAS 1460
CALC_BBLS_H2O 574
CALC_BBLS_OIL 651
CALC_GOR 272
CALC_MCF_GAS 177
CASING_PRESS 930
GRAVITY_OIL 35
MCF_GAS 177
TUBING_PRESS 450
Perforation Data:
Interval Top:6364 ft.# Of Holes:1440
Interval Bottom:13783 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)3116
Total Gas Produced (MCF)16314
GOR5235
GOR DeterminationBOE
Average BOE per Day15.911
Average MCFE per Day92.292

 Federal Financial Assurance  i 

 Tribal Well  i No