7994 | Projects | 2146232 | SITE INVESTIGATION AND REMEDIATION WORKPLAN | 1977627 | 9/18/2013 | Download |
7994 | Projects | 2146234 | ANALYTICAL RESULTS - BACKGROUND ARSENIC | 318658 | 9/18/2013 | Download |
7994 | Projects | 2146235 | ANALYTICAL RESULTS - PILE 20-25 REMIX DAY 1 | 573623 | 9/18/2013 | Download |
7994 | Projects | 2146236 | ANALYTICAL RESULTS - PILE 20-25 REMIX DAY 2 | 574363 | 9/18/2013 | Download |
7994 | Projects | 2146237 | ANALYTICAL RESULTS - PILE 20-25 REMIX DAY 3 | 579004 | 9/18/2013 | Download |
7994 | Projects | 2146238 | ANALYTICAL RESULTS - PILE 20-25 REMIX DAY 4 | 509008 | 9/18/2013 | Download |
7994 | Projects | 2146239 | ANALYTICAL RESULTS - PILE 20-25 REMIX DAY 5 AND DAY 6 | 638516 | 9/18/2013 | Download |
7994 | Projects | 2146240 | ANALYTICAL RESULTS - BACKGROUND ARSENIC | 327717 | 9/18/2013 | Download |
7994 | Projects | 2146241 | ANALYTICAL RESULTS - RAMP EXCAVATED MATERIAL | 506679 | 9/18/2013 | Download |
7994 | Projects | 2146242 | ANALYTICAL RESULTS - RAMP SIDEWALL 1, 2, AND 3 | 841894 | 9/18/2013 | Download |
7994 | Projects | 2146243 | ANALYTICAL RESULTS - CUT #1 SUBLINER | 1561034 | 9/18/2013 | Download |
7994 | Projects | 2146244 | ANALYTICAL RESULTS - CUTTINGS #1, #2, AND #3 CONTENTS | 2452164 | 9/18/2013 | Download |
7994 | Projects | 2146245 | ANALYTICAL RESULTS - CUT #2 SUBLINER | 1535308 | 9/18/2013 | Download |
7994 | Projects | 2146246 | ANALYTICAL RESULTS - CUTTINGS 3 SUBLINER 1' | 1560538 | 9/18/2013 | Download |
7994 | Projects | 2146247 | ANALYTICAL RESULTS - FW EAST AND NORTH VERTICAL THIRDS | 1627305 | 9/18/2013 | Download |
7994 | Projects | 2146248 | ANALYTICAL RESULTS - FW EXCAVATED MATERIAL (10/9) | 570842 | 9/18/2013 | Download |
7994 | Projects | 2146249 | ANALYTICAL RESULTS - FW EXCAVATED MATERIAL (10/29) | 511998 | 9/18/2013 | Download |
7994 | Projects | 2146250 | ANALYTICAL RESULTS - SUBLINER EXCAVATION CRUSHED | 1181709 | 9/18/2013 | Download |
7994 | Projects | 2146251 | ANALYTICAL RESULTS - SUBLINER EXCAVATION CRUSHED | 694930 | 9/18/2013 | Download |
7994 | Projects | 2146252 | ANALYTICAL RESULTS - FW SUBLINER N. HALF (-11') COMP | 570561 | 9/18/2013 | Download |
7994 | Projects | 2146253 | ANALYTICAL RESULTS - FW NORTH HALF (-13') COMP | 508040 | 9/18/2013 | Download |
7994 | Projects | 2146254 | ANALYTICAL RESULTS - FW N SIDEWALL SW CENTER THIRD AND W THIRD | 872653 | 9/18/2013 | Download |
7994 | Projects | 2146255 | ANALYTICAL RESULTS - FW NORTH SIDEWALL SUBLINER | 876292 | 9/18/2013 | Download |
7994 | Projects | 2146256 | ANALYTICAL RESULTS - FW N. E. BOTTOM AND EXCAVATED MATERIAL | 1109191 | 9/18/2013 | Download |
7994 | Projects | 2146257 | ANALYTICAL RESULTS - FW SOUTH HALF -3' | 635791 | 9/18/2013 | Download |