403573436 | Form 17 | 10/26/2023 | 10/26/2023 | | 2 | CONTINUOUS | GAS | 0 | NO FLOW | 840 | 840 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 9/19/2022 | 10/10/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 137 | 137 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 9/19/2022 | 11/14/2022 | Plunger Lift | 11 | Continuous | None | -- | No Flow | 939 | 936 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 11/12/2021 | 12/6/2021 | Plunger Lift | 7 | Continuous | None | -- | Whisper | 888 | 888 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
402441835 | Form 17 | 6/16/2020 | 7/13/2020 | | 9 | CONTINUOUS | -- | 1 | WHISPER | 941 | 941 | No | -- | -- | Surface Casing produced no liquid. |
Click for Specifics | Full | 10/25/2019 | 12/10/2019 | | 74 | Gas | | 1 | Whisper (Very Low Flow) | 947 | 947 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
400828188 | Form 17 | 4/6/2015 | 4/21/2015 | PLUNGER LIFT | 61 | GAS | -- | 1 | GAS | 579 | 579 | No | -- | -- | MONITORED THE SURFACE CASING AN EXTRA 30 MINUTES, PRESSURE STAYED AT A WHISPER. SHUT THE SURFACE CASING IN FOR 15 MINUTES, PRESSURE BUILT UP TO 7 PSI. MASTER VALVE CLOSED. WELL SHUT-IN AND TORE APART. INITIAL POST REMEDIATION
BLOW-DOWN ON 4/2/15 STARTED AT 156 PSI, AND BLEW-DOWN TO A WHISPER OF GAS. |
400730352 | Form 17 | 10/8/2014 | 11/13/2014 | PLUNGER LIFT | 309 | GAS | -- | 98 | GAS | 263 | 284 | No | -- | -- | SC PRODUCED NO FLUIDS, MONITORED THE SC AN EXTRA 30 MINS, PRESSURE ENDED AT 15 PSI |
400293666 | Form 17 | 5/14/2012 | 6/8/2012 | PLUNGER LIFT | 298 | GAS | -- | 181 | GAS | 291 | 302 | No | -- | -- | No fluid was produced during 30 minute blow down |