|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 2/13/2024 Measured TD: 7880 ft. Vertical TD: 7775 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 2/13/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/15/2012 | Proposed Top PZ Location: | Sec:21 Twp: 3N 65W | Footage: 1381 FNL 2387 FEL | Bottom Hole Location: | Sec:21 Twp: 3N 65W | Footage: 1413 FNL 2371 FEL | Proposed Depth/Form: | 7880 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 731 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 460, Top: 0 ft., Bottom: 731 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7871 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 600, Top: 3000 ft., Bottom: 7871 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 2/17/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7880 ft. | Measured PB depth: | 7841 ft. | True Vertical TD: | 7775 ft. | True Vertical PB depth: | 7735 ft. | Top PZ Location: | Sec:21 Twp: 3N 65W | Footage: 1381 FNL 2387 FEL | Bottom Hole Location: | Sec:21 Twp: 3N 65W | Footage: 1413 FNL 2371 FEL | Log Types: | CAL-CNL-DL-GR-IEL-ML, CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 731 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 0 ft., Bottom: 731 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7871 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 600, Top: 3100 ft., Bottom: 7871 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1515 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 185, Top: 464 ft., Bottom: 1515 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3990 ft. | 4190 ft. | N | N | SUSSEX | 4315 ft. | 4440 ft. | N | N | NIOBRARA | 6997 ft. | | N | N | FORT HAYS | 7272 ft. | | N | N | CODELL | 7297 ft. | | N | N | J SAND | 7716 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 8/18/2010 Interval Top: 7298 ft. Interval Bottom: 7314 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/19/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/19/2009 | Treatment Summary: | 170,000 GALS FLUID & 115,000 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7298 ft. | # Of Holes: | 64 | Interval Bottom: | 7314 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/13/2024 Interval Top: 7016 ft. Interval Bottom: 7314 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/19/2009 | Choke Size: | 0.156 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/21/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/21/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1231 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 29 | CALC_GOR | 8040 | CALC_MCF_GAS | 233 | CASING_PRESS | 1400 | GRAVITY_OIL | 50 |
| Perforation Data: | Interval Top: | 7016 ft. | # Of Holes: | 130 | Interval Bottom: | 7314 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/18/2010 Interval Top: 7016 ft. Interval Bottom: 7152 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/19/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/23/2009 | Treatment Summary: | 246,000 GALS FLUID & 201,00 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7016 ft. | # Of Holes: | 66 | Interval Bottom: | 7152 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 02/13/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|