Click for Specifics | Full | 4/15/2024 | 4/30/2024 | | 10 | Down to Zero | -- | 0 | Down to Zero | 380 | 372 | No | No | No | |
Click for Specifics | Full | 8/1/2023 | 8/14/2023 | Shut In | 18 | Down to Zero | -- | 0 | Down to Zero | 662 | 662 | No | No | No | Annual Test. 18 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403193351 | Form 17 | 10/10/2022 | 10/11/2022 | FLOWING | 63 | DOWN TO 0 | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 697 | 695 | Yes | -- | -- | Automation Alert test. 63 PSI gas and liquid hydrocarbon blew down to 0 PSI in five minutes through 1/2" needle valve. No flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
402835697 | Form 17 | 10/7/2021 | 10/8/2021 | FLOWING | 34 | DOWN TO 0 | MUD | 0 | NO FLOW | 1323 | 1322 | Yes | -- | Yes | Test after DOFP. Mud on open, attempted BH sample. Produced ~1/2 gallon and died. No flow for remainder of test. |
402726098 | Form 17 | 6/21/2021 | 6/22/2021 | SHUT-IN | 3 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. Whisper on open for 10 seconds. |