Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10065
Well Classification: OW Status: PR - 8/26/2021
Well Name/No:Prairie LE #17-019HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/26/2021
FacilityID:450936LocationID:450942
Municipality/County:BRIGHTON / ADAMS #001Location:SWSW 20 1S66W 6
Field:WATTENBERG - #90750Elevation:5047 ft.
Planned Location:477FSL  1317 FWLLat/Long: 39.944638 / -104.804130Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2021
End Date: 7/12/2021
Reported: 7/27/2021
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/26/2021             Measured TD: 18160 ft.    Vertical TD: 7712 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/26/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/9/2023
Proposed Top PZ Location:Sec:20 Twp: 1S 66W Footage: 539 FSL  501 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66W Footage: 302 FNL  514 FWL
Proposed Depth/Form:18591 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3705 , Unit Acreage: 640, Drill Unit: Sec 17, 20 W 1/2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3705 , Unit Acreage: 640, Drill Unit: Sec 17, 20 W 1/2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3705 , Unit Acreage: 640, Drill Unit: Sec 17, 20 W 1/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3705 , Unit Acreage: 640, Drill Unit: Sec 17, 20 W 1/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18591 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2369, Top: , Bottom: 18591 ft.

Wellbore Completed
Completion Date:4/5/2021
Spud Date:2/9/2021Spud Date Is:ACTUAL
Measured TD:18160 ft.Measured PB depth:18155 ft.
True Vertical TD:7712 ft.True Vertical PB depth:7712 ft.
Top PZ Location:Sec:20 Twp: 1S 66WFootage: 539 FSL  501 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66WFootage: 302 FNL  514 FWL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-10066)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2042 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2042 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18160 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2440, Top: 4756 ft., Bottom: 18160 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4511 ft.4688 ft.NN
SUSSEX4926 ft.5093 ft.NN
SHANNON5496 ft.5707 ft.NN
SHARON SPRINGS7167 ft.NN
NIOBRARA7520 ft.NN
FORT HAYS8251 ft.NN
CODELL8401 ft.NN
CARLILE9480 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/19/2024                 Interval Top: 11365 ft.    Interval Bottom: 11758 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/23/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11365 ft.# Of Holes:1152
Interval Bottom:11758 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 9/19/2024                 Interval Top: 9480 ft.    Interval Bottom: 10603 ft.

 Completed Information for Formation CARLILE
1st Production Date:8/23/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9480 ft.# Of Holes:1152
Interval Bottom:10603 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 8/26/2021                 Interval Top: 8445 ft.    Interval Bottom: 17941 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:8/23/2021Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/24/2021Treatment End Date:7/12/2021
Treatment Summary:250 bbls 15% HCL Acid; 481,149 # 100 Mesh Sand; 6,717,353 # 20/40 Sand; 165,058 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):165308Max pressure during treatment (psi):4454
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):250Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):22373
Fresh water used in treatment (bbls):165058Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7198502Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8035 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 383
BBLS_OIL 510
BTU_GAS 1542
CALC_BBLS_H2O 383
CALC_BBLS_OIL 510
CALC_GOR 657
CALC_MCF_GAS 335
CASING_PRESS 2236
GRAVITY_OIL 43
MCF_GAS 335
TUBING_PRESS 1793
Perforation Data:
Interval Top:8445 ft.# Of Holes:1152
Interval Bottom:17941 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/19/2024                 Interval Top: 8445 ft.    Interval Bottom: 17941 ft.

 Completed Information for Formation CODELL
1st Production Date:8/23/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/19/2024Treatment End Date:N/A
Treatment Summary:Codell perf intervals: 8445-9479, 10604-11364, 11759-17941
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8445 ft.# Of Holes:1152
Interval Bottom:17941 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)13140
Total Gas Produced (MCF)135764
GOR10332
GOR DeterminationBOE
Average BOE per Day97.612
Average MCFE per Day566.145

 Federal Financial Assurance  i 

 Tribal Well  i No