Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33249
Well Classification: OW Status: PR - 6/1/2020
Well Name/No:HERREN #1A-33H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2020
FacilityID:422411LocationID:421058
County:WELD #123Location:NENE 33 3N67W 6
Field:WATTENBERG - #90750Elevation:4824 ft.
Planned Location:246FNL  253 FELLat/Long: 40.188800 / -104.886690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.188778 / -104.886686Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/15/2011
End Date: 7/15/2011
Reported: 2/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 201
Disclosure: Sidetrack #00
Start Date: 8/27/2018
End Date: 9/2/2018
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 278
Days to report: 199
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2020             Measured TD: 11643 ft.    Vertical TD: 7109 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/30/2013
Proposed Top PZ Location:Sec:33 Twp: 3N 67W Footage: 1073 FNL  612 FEL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 1277 FNL  461 FWL
Proposed Depth/Form:11609 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 166, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7340 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 582, Top: 500 ft., Bottom: 7340 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11568 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: 1ST LINER, Hole Size: 4 in., Size: 3.81 in., Top: 7128 ft., Depth: 11275 ft., Weight: 8.8 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/18/2011
Spud Date:5/17/2011Spud Date Is:ACTUAL
Measured TD:11643 ft.Measured PB depth:11643 ft.
True Vertical TD:7109 ft.True Vertical PB depth:7109 ft.
Top PZ Location:Sec:33 Twp: 3N 67WFootage: 1073 FNL  612 FEL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 1277 FNL  461 FWL
Log Types:CBL/ COMPENSATED DENSITY NEUTRON LONG/ HOLE VIOLUME DENISTY CALIPER LOG/ 8 ARM CALIPER IMAGER LOG/ ARRAY INDUCTION LOG/ GEO LOG PLOT
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 76 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 76 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 832 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 832 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.875 in., Size: 7 in., Top: 0 ft., Depth: 7438 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 2230 ft., Bottom: 7438 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11638 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 7511 ft., Bottom: 11568 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4201 ft.
NIOBRARA7221 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2020                  Interval Top: 7440 ft.    Interval Bottom: 11433 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/20/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/27/2018Treatment End Date:9/2/2018
Treatment Summary:195461 bbl water, 258 bbl additives (FRP-4CS and Plexslick 986C) and 420 bbl HCl in a 28 stage frac with 4721038 lb of silica quartz proppant
Total fluid used in treatment (bbls):196139Max pressure during treatment (psi):9103
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):420Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4712
Fresh water used in treatment (bbls):195461Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4721038Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/15/2011
Treatment Summary:STAGE 1. PUMPED 32000# 40/70 SAND AND 289000# 30/50 SAND. AVE PRESSURE 6949, AVE RATE 5.4 TLTR 5182 BBLS CHEMICAL TRACED STAGE 1. STAGE 2. PUMPED 32000# 40/70 SAND AND 286200# 30/50 SAND. AVE PRESSURE 6965, AVE RATE 51.1 TLTR 5299 BBLS CHEMICAL TRACED STAGE 2. STAGE 3. PUMPED 30000# 40/70 SAND AND 285300# 30/50 SAND. AVE PRESSURE 6151, AVE RATE 51.2 TLTR 5035 BBLS STAGE 4. PUMPED 30000# 40/70 SAND AND 290000# 30/50 SAND. AVE PRESSURE 6096, AVE RATE 51.6 TLTR 5067 BBLS STAGE 5. PUMPED 30000# 40/70 SAND AND 285000# 30/50 SAND. AVE PRESSURE 5790 PSI, AVE RATE 50.1 TLTR 4849 BBLS STAGE 6. PUMPED 33800# 40/70 SAND AND 285530# 30/50 SAND. AVE PRESSURE 5894, AVE RATE 51.4 BPM. TLTR 5029 BBLS STAGE 7. PUMPED 31400# 40/70 SAND AND 284000# 30/50 SAND. AVE PRESSURE 5583 PSI, AVE RATE 51.3 TLTR 4866 BBLS STAGE 8. PUMPED 29998# 40/70 SAND AND 284518# 30/50 SAND. PAVG 5457 PSI, QAVG 52.1 BPM, TLTR 4786 BBLS STAGE 9. PUMPED 29943# 40/70 SAND AND 283645# 30/50 SAND. PAVG 5697 PSI, QAVG 53.1 BPM, TLTR 4850 BBLS STAGE 10. PUMPED 30011# 40/70 SAND AND 282800# 30/50 SAND. AVE PRESSURE 5334 PSI, AVE RATE 51.6 TLTR 4838 BBLS STAGE 11. PUMPED 30095# 40/70 SAND AND 283811# 30/50 SAND. PAVG 5433 PSI, QAVG 53.6 BPM. TLTR 4847 BBLS STAGE 12. PUMPED 29992# 40/70 SAND AND 284465# 30/50 SAND. PAVG 5319 PSI, QAVG 51.9 BPM. TLTR 4854 BBLS STAGE 13. PUMPED 25241# 40/70 SAND AND 285009# 30/50 SAND. PAVG 5337 PSI, QAVG 51.6 BPM. TLTR 4837 BBLS STAGE 14. PUMPED 30006# 40/70 SAND AND 284501# 30/50 SAND. PAVG 5266 PSI, QAVG 51.2 BPM. TLTR 5096 BBLS STAGE 15. PUMPED 30038# 40/70 SAND AND 283117# 30/50 SAND. PAVG 5071 PSI, QAVG 51.4 BPM. TLTR 4857 BBLS STAGE 16. PUMPED 28032# 40/70 SAND AND 286432# 30/50 SAND. PAVG 5133 PSI, QAVG 51.4 BPM. TLTR 4762 BBLS STAGE 17. PUMPED 20015# 40/70 SAND AND 179448# 30/50 SAND. PAVG 5202 PSI, QAVG 51.7 BPM. TLTR 4271 BBLS
Tubing Size:2.375 in.Tubing Setting Depth:7078 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/17/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 104
BTU_GAS 1365
CALC_BBLS_H2O 102
CALC_BBLS_OIL 104
CALC_GOR 5875
CALC_MCF_GAS 611
CASING_PRESS 950
GRAVITY_OIL 48
MCF_GAS 611
TUBING_PRESS 1650
Perforation Data:
Interval Top:7440 ft.# Of Holes:678
Interval Bottom:11433 ft.Hole Size:2.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)2592
Total Gas Produced (MCF)68530
GOR26439
GOR DeterminationMCFE
Average BOE per Day38.929
Average MCFE per Day225.790

 Federal Financial Assurance  i 

 Tribal Well  i No