Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10533
Well Classification: OW Status: PR - 12/1/2021
Well Name/No:M.C.HAGOOD A #12X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:062265
Facility Status:PRStatus Date12/1/2021
FacilityID:274583LocationID:316439
County:RIO BLANCO #103Location:NESW 15 2N103W 6
Field:RANGELY - #72370Elevation:5530 ft.
Planned Location:2425FSL  2271 FWLLat/Long: 40.142455 / -108.943678Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.142560 / -108.943800Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2021             Measured TD: 6938 ft.    Vertical TD: 6926 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2021
Wellbore Permit
Permit #:20042347 Expiration Date:11/8/2005
Prop Depth/Form:6781 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/12/2005
Spud Date:2/24/2005Spud Date Is:ACTUAL
Measured TD:6938 ft.Measured PB depth:
True Vertical TD:6926 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2308 FSL  1957 FWLDepth
Bottom Hole Location:Sec: Twp: Footage: 2320 FSL  1953 FWLDepth
Log Types:COMPENSATED NEU LOG/GR,CBL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1026 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 565, Top: 0 ft., Bottom: 1026 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 6938 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 0 ft., Bottom: 6937 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3840 ft.NN
MORRISON3936 ft.NN
CURTIS4640 ft.NN
ENTRADA4740 ft.NN
CARMEL4888 ft.NN
NAVAJO4938 ft.NN
CHINLE5574 ft.NN
SHINARUMP5686 ft.NN
MOENKOPI5753 ft.NN
WEBER6442 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 12/1/2021                 Interval Top: 6442 ft.    Interval Bottom: 6718 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:FLOWING WELL
Open Hole Completion:No
Formation Treatment
Treatment Date:5/12/2005
Treatment Summary:PUMPED 105,542# 20/40 JORDAN SAND. JOB WAS RAMPED FROM 2# UP TO 8# AS DESIGN. 62,356# OF SAND IN ZONE, 43,186# SAND LEFT IN CASING. 1,425 BBLS OF LOAD TO RECOVER.
Tubing Size:2.875 in.Tubing Setting Depth:6373 ft.
Tubing Packer Depth:6358 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/18/2005Test Method:TEST VESSEL
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 888
BBLS_OIL 279
CALC_BBLS_H2O 828
CALC_BBLS_OIL 288
CALC_GOR 6427
CALC_MCF_GAS 1851
GRAVITY_OIL 34
MCF_GAS 2014
Perforation Data:
Interval Top:6442 ft.# Of Holes:714
Interval Bottom:6718 ft.Hole Size:3 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)6056
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day16.557
Average MCFE per Day96.029

 Federal Financial Assurance  i Y

 Tribal Well  i No