| 404326575 | Form 17 | 8/19/2025 | 8/22/2025 | PUMPING | 100 | CONTINUOUS | GAS | 0 | WHISPER | 110 | 110 | Yes | Yes | -- | 7 DAY BUILD UP. SURFACE CASING TIED INTO FLOWLINE. GAS SAMPLE TAKEN. SAMPLE ID: 05-103-10533 |
| Click for Specifics | Full | 10/23/2024 | 11/4/2024 | | 100 | Continuous | -- | 0 | Continuous | 90 | 90 | No | No | No | |
| Click for Specifics | Full | 2/6/2024 | 10/7/2024 | | 203 | Continuous | -- | 0 | No Flow | 100 | 100 | No | No | No | 7 day build up. Surface casing tied to flowline. |
| Click for Specifics | Full | 2/24/2023 | 3/6/2023 | Pumping | 820 | Down to Zero | -- | 0 | Down to Zero | 78 | 78 | No | No | No | |
| 402962450 | Form 17 | 2/22/2022 | 2/22/2022 | PUMPING | 457 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 100 | 100 | Yes | Yes | -- | |
| Click for Specifics | Full | 3/18/2021 | 4/5/2021 | Pumping | 6 | Continuous | -- | 0 | No Flow | 100 | 100 | No | No | No | |