Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22546
Well Classification: GW Status: PR - 11/30/2015
Well Name/No:Federal RU #544-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date11/30/2015
FacilityID:439596LocationID:335044
County:GARFIELD #045Location:SWSE 6 7S93W 6
Field:RULISON - #75400Elevation:7537 ft.
Basin:PICEANCE BASIN  
Planned Location:974FSL  1892 FELLat/Long: 39.467746 / -107.814699Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.467746 / -107.814699Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/3/2015
End Date: 10/9/2015
Reported: 11/16/2015
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/30/2015             Measured TD: 9905 ft.    Vertical TD: 9766 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/30/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/30/2016
Proposed Top PZ Location:Sec:6 Twp: 7S 93W Footage: 207 FSL  589 FEL
Bottom Hole Location:Sec:6 Twp: 7S 93W Footage: 200 FSL  609 FEL
Proposed Depth/Form:9876 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: 218, Drill Unit: E/2 SEC 6
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 295, Top: 0 ft., Bottom: 1117 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9898 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 946, Top: 6030 ft., Bottom: 9898 ft.

Wellbore Completed
Completion Date:8/21/2015
Spud Date:8/13/2015Spud Date Is:ACTUAL
Measured TD:9905 ft.Measured PB depth:9865 ft.
True Vertical TD:9766 ft.True Vertical PB depth:9726 ft.
Top PZ Location:Sec:6 Twp: 7S 93WFootage: 207 FSL  589 FEL
Bottom Hole Location:Sec:6 Twp: 7S 93WFootage: 200 FSL  609 FEL
Log Types:CBL/MUD/Triple Combination
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1186 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1186 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.375 in., Size: 4.5 in., Top: 0 ft., Depth: 9895 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1055, Top: 4416 ft., Bottom: 9895 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3570 ft.
MESAVERDE6114 ft.
WILLIAMS FORK6114 ft.
CAMEO8954 ft.
ROLLINS9753 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2015                Interval Top: 7131 ft.    Interval Bottom: 9675 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/4/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/3/2015Treatment End Date:10/9/2015
Treatment Summary:4500 Gals 7 1/2% HCL; 114641 BBLs Slickwater; 2113100 100/Mesh; (summary)
Total fluid used in treatment (bbls):114748Max pressure during treatment (psi):7281
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):107Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):114641Total flowback volume recovered (bbls):16561
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):2113100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9407 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1112
CALC_MCF_GAS 1355
CASING_PRESS 2485
MCF_GAS 1355
TUBING_PRESS 1840
Perforation Data:
Interval Top:7131 ft.# Of Holes:324
Interval Bottom:9675 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)88
Total Gas Produced (MCF)52442
GOR595931
GOR DeterminationMCFE
Average BOE per Day25.009
Average MCFE per Day145.045

 Federal Financial Assurance  i Y

 Tribal Well  i No