| Click for Specifics | Full | 5/14/2025 | 6/9/2025 | | 3 | N/A | -- | 0 | No Flow | 255 | 266 | No | No | No | 2" BH |
| 403951592 | Form 17 | 10/9/2024 | 10/9/2024 | PLUNGER LIFT | 0 | DOWN TO 0 | NONE | 0 | NO FLOW | 339 | 341 | No | -- | -- | This Form 17 is being submitted to satisfy a COA that was attached to an approved Form 4 (403815610) which requires a bradenhead test following completion of the repair. |
| 403780492 | Form 17 | 5/1/2024 | 5/6/2024 | SHUT-IN | 304 | CONTINUOUS | GAS | 51 | CONTINUOUS | 306 | 299 | No | -- | -- | TEP has initiated diagnostic testing based on the bradenhead test results. This test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/15/2024 | 3/19/2024 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 323 | 314 | No | No | No | 1/2 bh |
| Click for Specifics | Full | 7/25/2023 | 8/14/2023 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 280 | 271 | No | No | No | 1/2" BH |
| Click for Specifics | Full | 4/1/2022 | 5/16/2022 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 290 | 280 | No | No | No | Blow down 1/2” |
| Click for Specifics | Full | 5/13/2021 | 6/7/2021 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 234 | 244 | No | No | No | |
| Click for Specifics | Light | 10/1/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2017 | 6/2/2020 | | 19 | | | 0 | | -- | -- | Yes | Yes | No | |
| Click for Specifics | Light | 1/1/2016 | 6/2/2020 | | 58 | | | 0 | | -- | -- | Yes | No | Yes | |