Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46043
Well Classification: OW Status: SI - 10/1/2023
Well Name/No:Postle IC #09-302HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2023
FacilityID:453349LocationID:433857
County:WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4976 ft.
Planned Location:1568FNL  579 FWLLat/Long: 40.243670 / -104.977706Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243669 / -104.977705Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/22/2018
End Date: 5/15/2018
Reported: 6/11/2018
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 10/1/2023             Measured TD: 18725 ft.    Vertical TD: 7225 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 10/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/10/2019
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 1225 FSL  250 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 1218 FSL  414 FWL
Proposed Depth/Form:18800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18800 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2412, Top: , Bottom: 18800 ft.

Wellbore Completed
Completion Date:2/14/2018
Spud Date:1/6/2018Spud Date Is:ACTUAL
Measured TD:18725 ft.Measured PB depth:18717 ft.
True Vertical TD:7225 ft.True Vertical PB depth:7225 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 1225 FSL  250 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 1218 S  414 W
Log Types:CBL, Mud Log, MWD/LWD, Composite, (Triple Combo 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1523 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 672, Top: 0 ft., Bottom: 1523 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18725 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3196, Top: 914 ft., Bottom: 18725 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3716 ft.3993 ft.NN
SUSSEX4264 ft.4422 ft.NN
SHANNON4850 ft.4954 ft.NN
SHARON SPRINGS7502 ft.NN
NIOBRARA7664 ft.NN
FORT HAYS8170 ft.NN
CODELL8307 ft.NN
CARLILE12663 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 6/15/2020                 Interval Top: 12663 ft.    Interval Bottom: 14937 ft.

 Completed Information for Formation CARLILE
1st Production Date:6/30/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 12663 - 12910, 13747 - 14937
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12663 ft.# Of Holes:1560
Interval Bottom:14937 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/15/2020                 Interval Top: 11870 ft.    Interval Bottom: 18580 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/30/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval: 11870 - 12044, 16185 - 16561, 17875 - 18580
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:11870 ft.# Of Holes:1560
Interval Bottom:18580 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/15/2020                 Interval Top: 11512 ft.    Interval Bottom: 17874 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:6/30/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 11512 - 11869, 12045 - 12171, 16021 - 16184, 16639 - 16654, 17514 - 17874
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11512 ft.# Of Holes:1560
Interval Bottom:17874 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/15/2020                 Interval Top: 8320 ft.    Interval Bottom: 17513 ft.

 Completed Information for Formation CODELL
1st Production Date:6/30/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8320 - 11511, 12172 - 12662, 12911 - 13746, 14938 - 16020, 16562 - 16638, 16655 - 17513
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8320 ft.# Of Holes:1560
Interval Bottom:17513 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  SI - 10/1/2023                 Interval Top: 8320 ft.    Interval Bottom: 18580 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:6/30/2018Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/22/2018Treatment End Date:5/15/2018
Treatment Summary:567,327 lbs 100 Mesh Sand; 9,816,250 lbs 20/40 Sand; 185,121 bbls Gelled Fluid. Flowback determined from well test separator.
Total fluid used in treatment (bbls):185121Max pressure during treatment (psi):4378
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):19928
Fresh water used in treatment (bbls):185121Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10383577Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7888 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 819
BBLS_OIL 425
BTU_GAS 1272
CALC_BBLS_H2O 819
CALC_BBLS_OIL 425
CALC_GOR 1058
CALC_MCF_GAS 450
CASING_PRESS 2173
GRAVITY_OIL 44
MCF_GAS 450
TUBING_PRESS 1297
Perforation Data:
Interval Top:8320 ft.# Of Holes:1560
Interval Bottom:18580 ft.Hole Size:0.38 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
01/29/2025
Defined Inactive (SI )YDefined Inactive
09/30/2023
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No