Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46043
Well Classification: OW Status: SI - 10/1/2023
Well Name/No:Postle IC #09-302HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2023
FacilityID:453349LocationID:433857
County:WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4976 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1568FNL  579 FWLLat/Long: 40.243670 / -104.977706Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243669 / -104.977705Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/22/2018
End Date: 5/15/2018
Reported: 6/11/2018
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 10/1/2023             Measured TD: 18725 ft.    Vertical TD: 7225 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 10/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/10/2019
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 1225 FSL  250 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 1218 FSL  414 FWL
Proposed Depth/Form:18800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18800 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2412, Top: , Bottom: 18800 ft.

Wellbore Completed
Completion Date:2/14/2018
Spud Date:1/6/2018Spud Date Is:ACTUAL
Measured TD:18725 ft.Measured PB depth:18717 ft.
True Vertical TD:7225 ft.True Vertical PB depth:7225 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 1225 FSL  250 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 1218 FSL  414 FWL
Log Types:CBL, Mud Log, MWD/LWD, Composite, (Triple Combo 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1523 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 672, Top: 0 ft., Bottom: 1523 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18725 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3196, Top: 914 ft., Bottom: 18725 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3716 ft.3993 ft.NN
SUSSEX4264 ft.4422 ft.NN
SHANNON4850 ft.4954 ft.NN
SHARON SPRINGS7502 ft.NN
NIOBRARA7664 ft.NN
FORT HAYS8170 ft.NN
CODELL8307 ft.NN
CARLILE12663 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 6/15/2020                 Interval Top: 12663 ft.    Interval Bottom: 14937 ft.

 Completed Information for Formation CARLILE
1st Production Date:6/30/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 12663 - 12910, 13747 - 14937
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12663 ft.# Of Holes:1560
Interval Bottom:14937 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/15/2020                 Interval Top: 11870 ft.    Interval Bottom: 18580 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/30/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval: 11870 - 12044, 16185 - 16561, 17875 - 18580
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:11870 ft.# Of Holes:1560
Interval Bottom:18580 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/15/2020                 Interval Top: 11512 ft.    Interval Bottom: 17874 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:6/30/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 11512 - 11869, 12045 - 12171, 16021 - 16184, 16639 - 16654, 17514 - 17874
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11512 ft.# Of Holes:1560
Interval Bottom:17874 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/15/2020                 Interval Top: 8320 ft.    Interval Bottom: 17513 ft.

 Completed Information for Formation CODELL
1st Production Date:6/30/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/15/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8320 - 11511, 12172 - 12662, 12911 - 13746, 14938 - 16020, 16562 - 16638, 16655 - 17513
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8320 ft.# Of Holes:1560
Interval Bottom:17513 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  SI - 10/1/2023                 Interval Top: 8320 ft.    Interval Bottom: 18580 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:6/30/2018Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/22/2018Treatment End Date:5/15/2018
Treatment Summary:567,327 lbs 100 Mesh Sand; 9,816,250 lbs 20/40 Sand; 185,121 bbls Gelled Fluid. Flowback determined from well test separator.
Total fluid used in treatment (bbls):185121Max pressure during treatment (psi):4378
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):19928
Fresh water used in treatment (bbls):185121Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10383577Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7888 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 819
BBLS_OIL 425
BTU_GAS 1272
CALC_BBLS_H2O 819
CALC_BBLS_OIL 425
CALC_GOR 1058
CALC_MCF_GAS 450
CASING_PRESS 2173
GRAVITY_OIL 44
MCF_GAS 450
TUBING_PRESS 1297
Perforation Data:
Interval Top:8320 ft.# Of Holes:1560
Interval Bottom:18580 ft.Hole Size:0.38 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
01/29/2025
Defined Inactive (SI )YDefined Inactive
09/30/2023
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No