Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31586
Well Classification: OW Status: PA - 5/13/2021
Well Name/No:DICKENS F #32-28D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/13/2021
FacilityID:417164LocationID:417161
County:WELD #123Location:SWNE 32 5N65W 6
Field:WATTENBERG - #90750Elevation:4668 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2080FNL  1887 FELLat/Long: 40.357360 / -104.684630Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.357370 / -104.684630Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/21/2012
End Date: 3/21/2012
Reported: 3/27/2012
Prior to rule 205A.b.(2)(A)
Days to report: 6
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/13/2021             Measured TD: 7704 ft.    Vertical TD: 7264 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/13/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/11/2012
Proposed Top PZ Location:Sec:32 Twp: 5N 65W Footage: 72 FNL  2591 FEL
Bottom Hole Location:Sec:32 Twp: 5N 65W Footage: 63 FNL  2600 FEL
Proposed Depth/Form:7669 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 525 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 226, Top: 0 ft., Bottom: 525 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7669 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 720, Top: , Bottom: 7669 ft.

Wellbore Completed
Completion Date:3/4/2012
Spud Date:2/29/2012Spud Date Is:ACTUAL
Measured TD:7704 ft.Measured PB depth:7649 ft.
True Vertical TD:7264 ft.True Vertical PB depth:7209 ft.
Top PZ Location:Sec:32 Twp: 5N 65WFootage: 72 FNL  2591 FEL
Bottom Hole Location:Sec:32 Twp: 5N 65WFootage: 63 FNL  2600 FEL
Log Types:CBL/GRL/CCL, CDL/CNL/ML, HRIL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 613 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 274, Top: 0 ft., Bottom: 613 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 7694 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 1908 ft., Bottom: 7694 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4681 ft.
SHANNON5309 ft.
NIOBRARA7192 ft.
FORT HAYS7505 ft.
CODELL7529 ft.
GREENHORN7576 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/7/2012                 Interval Top: 7529 ft.    Interval Bottom: 7543 ft.

 Completed Information for Formation CODELL
1st Production Date:3/26/2012Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/2012
Treatment Summary:Frac'd the Codell w/ 118405 gals of Silverstim and Slick Water with 245,800#'s of Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7529 ft.# Of Holes:56
Interval Bottom:7543 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/13/2021                 Interval Top: 7209 ft.    Interval Bottom: 7543 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/26/2012Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 47
BTU_GAS 1263
CALC_BBLS_H2O 22
CALC_BBLS_OIL 47
CALC_GOR 11297
CALC_MCF_GAS 531
CASING_PRESS 680
GRAVITY_OIL 60
MCF_GAS 531
Perforation Data:
Interval Top:7209 ft.# Of Holes:104
Interval Bottom:7543 ft.Hole Size:0 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/7/2012                 Interval Top: 7209 ft.    Interval Bottom: 7354 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/26/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/2012
Treatment Summary:Frac'd the Niobrara w/ 157968 gals of Silverstim and Slick Water with 250,500#'s of Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7209 ft.# Of Holes:48
Interval Bottom:7354 ft.Hole Size:0.69 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/13/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No