| 402741252 | Form 17 | 3/1/2021 | 7/8/2021 | SHUT-IN | 42 | WHISPER | GAS AND VAPOR | 0 | WHISPER | 1300 | 1300 | Yes | -- | -- | Pre P&A, 42 PSI continuous gas and vapor flow blew down to 0 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Light | 10/6/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 1200 | 1200 | No | No | No | |
| 402449785 | Form 17 | 11/9/2019 | 7/23/2020 | | 90 | GAS | -- | 5 | GAS | 670 | 670 | Yes | -- | -- | Annual Test 90 PSI with continuous flow, blew down to 5 PSI after 30 min.
PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via
sundry. |
| 402242635 | Form 17 | 11/9/2019 | 11/18/2019 | PLUNGER LIFT | 90 | GAS | -- | 5 | GAS | 670 | 670 | Yes | Yes | No | Annual bradenhead test. Bradenhead had slight blow. Bradenhead has been sampled and results will be uploaded into the EDD when availible.
|