|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2024 Measured TD: 7237 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2024 | | Wellbore Permit | | | Permit #: | 20085403 | Expiration Date: | 10/20/2009 | | Proposed Depth/Form: | 7620 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 9/25/2009 | | Spud Date: | 9/20/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7237 ft. | Measured PB depth: | 7178 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 514 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 514 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7198 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 795, Top: 548 ft., Bottom: 7198 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6696 ft. | | N | N | | FORT HAYS | 7005 ft. | | N | N | | CODELL | 7026 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 12/31/2009 Interval Top: 7030 ft. Interval Bottom: 7038 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/13/2009 | | Treatment Summary: | FRACD W/ 596 BBLS OF SLICKWATER PAD, 144 BBLS PHASER 20# PAD, 1992 BBLS PHASER 20# FLUID SYSTEM, 218240 LBS 30/50 WHITE SAND AND 8000 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7030 ft. | # Of Holes: | 24 | | Interval Bottom: | 7038 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 6/1/2024 Interval Top: 6703 ft. Interval Bottom: 7038 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/3/2009 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/13/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/1/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 129 | | BTU_GAS | 1254 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 129 | | CALC_GOR | 2109 | | CALC_MCF_GAS | 272 | | CASING_PRESS | 1546 | | GRAVITY_OIL | 46 | | MCF_GAS | 272 |
| | Perforation Data: | | Interval Top: | 6703 ft. | # Of Holes: | 46 | | Interval Bottom: | 7038 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/31/2009 Interval Top: 6703 ft. Interval Bottom: 6812 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/13/2009 | | Treatment Summary: | PERFD NIO A 6703-6705 (4), NIO B 6806-6812 (18). FRACD W/ 24BBLS 15% HCL, 1667 BBLS SLICKWATER PAD, 144 BBLS PHASER 20# PAD, 2250 BBLS PHASER 20# FLUID SYSTEM, 238580 LBS 30/50 WHITE SAND & 12000 LBS SB EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6703 ft. | # Of Holes: | 22 | | Interval Bottom: | 6812 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/05/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 05/31/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|