WELL05-123-29279GOLD
9NU
PDC ENERGY INC
69175
SI
6/1/2024
WATTENBERG
90750
WELD  123
NENW 9 4N67W 6
302527
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 514 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404405359Form 1710/14/202510/24/2025SHUT-IN40CONTINUOUS WATER H200 NO FLOW 00No----Pre-P&A. 40 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test.
404098591Form 172/4/20252/18/2025SHUT-IN0NO FLOW NONE0 NO FLOW 00No----Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsLight1/16/20251/28/2025 45 --0 11501150NoNoNo 
403703858Form 172/26/20242/29/2024SHUT-IN15CONTINUOUS WATER AND GAS0 DOWN TO 0 9090No----Annual test. 15 PSI water and gas flow blew down to 0 PSI in 3 minutes. Fluid dripped until 13 minute mark and then intermittent drip for remainder of test, ~1 quart total. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull2/22/20233/27/2023 0Down to Zero--0Down to Zero420420NoNoneNoneAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly.
403002887Form 173/31/20224/4/2022PLUNGER LIFT50CONTINUOUS WATER AND GAS0 NO FLOW 552552Yes----Annual Test, 50 PSI water and gas flow blew down to 0 PSI within first ten minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
402898155Form 1710/23/202112/14/2021PLUNGER LIFT0NO FLOW --0 NO FLOW 443443No----Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor monthly.
Click for SpecificsLight10/2/202012/3/2020 5 --0No Flow444444NoNoNo 
Click for SpecificsLight5/30/20198/18/2020 1 --0 710710NoNoNo