|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2021 Measured TD: 7882 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2021 | Wellbore Permit | | Permit #: | 710364 | Expiration Date: | 9/24/1971 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | 6/11/1971 | Spud Date: | 5/16/1971 | Spud Date Is: | ACTUAL | Measured TD: | 7882 ft. | Measured PB depth: | 7861 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 160 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 160, Top: 0 ft., Bottom: 160 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 160 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 160, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7882 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 7114 ft., Bottom: 7882 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7895 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | Additional Cement: | String Type: 1ST , Top: 3350 ft., Depth: 3995 ft., Bottom: 3988 ft., Sacks: 150, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 4635 ft., Depth: 5146 ft., Bottom: 5140 ft., Sacks: 150, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 6780 ft., Depth: 7060 ft., Bottom: 7060 ft., Sacks: 75, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7053 ft. | | | | J SAND | 7760 ft. | | | | SKULL CREEK | 7850 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 9/1/2021 Interval Top: 7760 ft. Completed Information for Formation J SAND | 1st Production Date: | 11/14/1981 | Choke Size: | 0.000 in. | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| No Perforation Data was found for formation JSND. |
|
Formation CODL Formation Classification: GW Status: SI - 9/1/2021 Interval Top: 7327 ft. Interval Bottom: 7344 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/22/2009 | Treatment Summary: | CDL RE-FRAC AND RECOMPLETION. SET RBP @ 7450'. 1/20/09. RE-FRAC'D THE CDL WITH 104118 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250560# SAND. 1/22/09 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7327 ft. | # Of Holes: | 68 | Interval Bottom: | 7344 ft. | Hole Size: | 0.42 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/6/2009 Interval Top: 7327 ft. Interval Bottom: 7813 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/11/1971 | Treatment Summary: | JSND-CDL COMMINGLE. RELEASED RBP @ 7450' TO COMMINGLE THE JSND-CDL. 3/2/09 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7752 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/6/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 12 | BBLS_OIL | 18 | BTU_GAS | 1282 | CALC_BBLS_H2O | 12 | CALC_BBLS_OIL | 18 | CALC_GOR | 7333 | CALC_MCF_GAS | 132 | CASING_PRESS | 371 | GRAVITY_OIL | 57 | MCF_GAS | 132 | TUBING_PRESS | 318 |
| Perforation Data: | Interval Top: | 7327 ft. | # Of Holes: | 97 | Interval Bottom: | 7813 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 08/31/2021 |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|