Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10094
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:B-Farm LD #18-392HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:452913LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5127 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:964FNL  1843 FWLLat/Long: 39.983708 / -104.933672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983706 / -104.933671Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/8/2019
End Date: 4/21/2019
Reported: 5/14/2019
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2022             Measured TD: 18619 ft.    Vertical TD: 8006 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 517 FNL  2195 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 6 FSL  2190 FEL
Proposed Depth/Form:18479 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1080, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18479 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2354, Top: 0 ft., Bottom: 18479 ft.

Wellbore Completed
Completion Date:1/30/2019
Spud Date:11/30/2018Spud Date Is:ACTUAL
Measured TD:18619 ft.Measured PB depth:18609 ft.
True Vertical TD:8006 ft.True Vertical PB depth:8006 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 517 FNL  2195 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 6 FSL  2190 FEL
Log Types:Mud, MWD/LWD, Composite, CBL (Composite in 001-10098)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1756 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1756 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18619 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2400, Top: 2490 ft., Bottom: 18619 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3595 ft.3763 ft.NN
SUSSEX4843 ft.5117 ft.NN
SHANNON6026 ft.6297 ft.NN
SHARON SPRINGS7687 ft.NN
NIOBRARA7854 ft.NN
FORT HAYS8425 ft.NN
CODELL8503 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/10/2020                 Interval Top: 12224 ft.    Interval Bottom: 12339 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/28/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12224 ft.# Of Holes:1470
Interval Bottom:12339 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/1/2022                 Interval Top: 8587 ft.    Interval Bottom: 18339 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:5/28/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/8/2019Treatment End Date:4/21/2019
Treatment Summary:503,220# 100 Mesh Sand; 9,325,360# 20/40 Sand; 168,253 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):168253Max pressure during treatment (psi):4725
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):29050
Fresh water used in treatment (bbls):168253Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9828580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8351 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 804
BBLS_OIL 369
BTU_GAS 1387
CALC_BBLS_H2O 804
CALC_BBLS_OIL 369
CALC_GOR 1442
CALC_MCF_GAS 532
CASING_PRESS 1950
GRAVITY_OIL 44
MCF_GAS 532
TUBING_PRESS 1200
Perforation Data:
Interval Top:8587 ft.# Of Holes:1470
Interval Bottom:18339 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8587 ft.    Interval Bottom: 18339 ft.

 Completed Information for Formation CODELL
1st Production Date:5/28/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:8587-12191,12387-13539,13590-18339
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8587 ft.# Of Holes:1470
Interval Bottom:18339 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4521
Total Gas Produced (MCF)102931
GOR22767
GOR DeterminationMCFE
Average BOE per Day59.309
Average MCFE per Day343.989

 Federal Financial Assurance  i 

 Tribal Well  i No