|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 5/1/2017 Measured TD: 10119 ft. Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 5/1/2017 | Wellbore Permit | | Permit #: | | Expiration Date: | 12/26/2018 | Prop Depth/Form: | 10119 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | Not available | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: ADMI , Formation: ADMIRE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: AMZN , Formation: AMAZON , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: COUGR , Formation: COUNCIL GROVE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: DJINJ , Formation: DENVER BASIN COMBINED DISPOSAL ZONE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: FNTN , Formation: FOUNTAIN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LSTKA , Formation: LOWER SATANKA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MSSR , Formation: MISSOURI , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRGL , Formation: VIRGIL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.09 , Citings Type: PLANNED | Cement: | Sacks: 10, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 477, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8750 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 379, Top: 6000 ft., Bottom: 8750 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8700 ft., Depth: 10119 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 6000 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 799, Top: 0 ft., Bottom: 6000 ft. |
| | |
Wellbore Completed | Completion Date: | 2/7/2017 | Spud Date: | 1/22/2017 | Spud Date Is: | ACTUAL | Measured TD: | 10119 ft. | Measured PB depth: | 10119 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CAL, Triple Combo, casing evaluation, CBL, DEN/NEU, IND, Mud | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 130, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1001 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 285, Top: 0 ft., Bottom: 1001 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8506 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 291, Top: 6420 ft., Bottom: 8506 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8438 ft., Depth: 10114 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: 1ST , Top: 940 ft., Depth: 6006 ft., Bottom: 6006 ft., Sacks: 842, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | LARAMIE | 0 ft. | | N | N | FOX HILLS | 313 ft. | | N | N | PIERRE | 532 ft. | | N | N | SUSSEX | 3722 ft. | | N | N | SHANNON | 4216 ft. | | N | N | SHARON SPRINGS | 6497 ft. | | N | N | NIOBRARA | 6524 ft. | | N | N | FORT HAYS | 6801 ft. | | N | N | CODELL | 6825 ft. | | N | N | CARLILE | 6839 ft. | | N | N | GREENHORN | 6901 ft. | | N | N | X BENTONITE | 7126 ft. | | N | N | J SAND | 7299 ft. | | N | N | SKULL CREEK | 7420 ft. | | N | N | DAKOTA | 7453 ft. | | N | N | LAKOTA | 7509 ft. | | N | N | MORRISON | 7611 ft. | | N | N | ENTRADA | 7885 ft. | | N | N | LYKINS | 7929 ft. | | N | N | LYKINS | 7929 ft. | | N | N | FORELLE | 8280 ft. | | N | N | MINNEKAHTA | 8342 ft. | | N | N | BLAINE | 8443 ft. | | N | N | LYONS | 8500 ft. | | N | N | LOWER SATANKA | 8631 ft. | | N | N | WOLFCAMP | 8944 ft. | | N | N | AMAZON | 9015 ft. | | N | N | COUNCIL GROVE | 9085 ft. | | N | N | ADMIRE | 9263 ft. | | N | N | VIRGIL | 9307 ft. | | N | N | MISSOURI | 9616 ft. | | N | N | FOUNTAIN | 9689 ft. | | N | N |
Formation FNTN Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 9689 ft. Interval Bottom: 10119 ft. Completed Information for Formation FOUNTAIN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FOUNTAIN | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FNTN. |
| Perforation Data: | Interval Top: | 9689 ft. | # Of Holes: | | Interval Bottom: | 10119 ft. | Hole Size: | |
|
Formation MSSR Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 9616 ft. Interval Bottom: 9689 ft. Completed Information for Formation MISSOURI | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MISSOURI | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MSSR. |
| Perforation Data: | Interval Top: | 9616 ft. | # Of Holes: | | Interval Bottom: | 9689 ft. | Hole Size: | |
|
Formation VRGL Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 9307 ft. Interval Bottom: 9616 ft. Completed Information for Formation VIRGIL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | VIRGIL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation VRGL. |
| Perforation Data: | Interval Top: | 9307 ft. | # Of Holes: | | Interval Bottom: | 9616 ft. | Hole Size: | |
|
Formation ADMI Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 9263 ft. Interval Bottom: 9307 ft. Completed Information for Formation ADMIRE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | ADMIRE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation ADMI. |
| Perforation Data: | Interval Top: | 9263 ft. | # Of Holes: | | Interval Bottom: | 9307 ft. | Hole Size: | |
|
Formation COUGR Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 9085 ft. Interval Bottom: 9263 ft. Completed Information for Formation COUNCIL GROVE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | COUNCIL GROVE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation COUGR. |
| Perforation Data: | Interval Top: | 9085 ft. | # Of Holes: | | Interval Bottom: | 9263 ft. | Hole Size: | |
|
Formation AMZN Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 9015 ft. Interval Bottom: 9085 ft. Completed Information for Formation AMAZON | 1st Production Date: | N/A | Choke Size: | | Formation Name: | AMAZON | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation AMZN. |
| Perforation Data: | Interval Top: | 9015 ft. | # Of Holes: | | Interval Bottom: | 9085 ft. | Hole Size: | |
|
Formation WFCMP Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 8944 ft. Interval Bottom: 9015 ft. Completed Information for Formation WOLFCAMP | 1st Production Date: | N/A | Choke Size: | | Formation Name: | WOLFCAMP | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCMP. |
| Perforation Data: | Interval Top: | 8944 ft. | # Of Holes: | | Interval Bottom: | 9015 ft. | Hole Size: | |
|
Formation LSTKA Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 8631 ft. Interval Bottom: 8944 ft. Completed Information for Formation LOWER SATANKA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | LOWER SATANKA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LSTKA. |
| Perforation Data: | Interval Top: | 8631 ft. | # Of Holes: | | Interval Bottom: | 8944 ft. | Hole Size: | |
|
Formation DJINJ Formation Classification: DSPW Status: IJ - 5/1/2017 Interval Top: 8500 ft. Interval Bottom: 10119 ft. Completed Information for Formation DENVER BASIN COMBINED DISPOSAL ZONE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DENVER BASIN COMBINED DISPOSAL ZONE | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8438 ft. | Tubing Packer Depth: | 8438 ft. | Tubing Multiple Packer: | | Open Hole Top: | 8500 ft. | Open Hole Bottom: | 10119 ft. | No Initial Test Data was found for formation DJINJ. |
| Perforation Data: | Interval Top: | 8500 ft. | # Of Holes: | | Interval Bottom: | 10119 ft. | Hole Size: | |
|
Formation LYNS Formation Classification: DSPW Status: CM - 4/7/2017 Interval Top: 8500 ft. Interval Bottom: 8631 ft. Completed Information for Formation LYONS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | LYONS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 8439 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LYNS. |
| Perforation Data: | Interval Top: | 8500 ft. | # Of Holes: | | Interval Bottom: | 8631 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|