Material Handling and Spill Prevention | Form: (02 ) 401151263 12/27/2016 | Load-lines. All load-lines shall be bull-plugged or capped. |
Drilling/Completion Operations | Form: (02 ) 401151263 12/27/2016 | Green Completions – No hydrocarbons are anticipated in this well. Hydrocarbon
bearing formaitons will be isolated behind cement and casing. |
Drilling/Completion Operations | Form: (02 ) 401151263 12/27/2016 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be
used during drilling. At least the drilling company shall have a valid well blowout
prevention certifications. |
Drilling/Completion Operations | Form: (02 ) 401151263 12/27/2016 | BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing
valves shall be installed in the event of reverse circulation and shall be prior tested
with low and high pressure fluid. |
Drilling/Completion Operations | Form: (02 ) 401151263 12/27/2016 | Drill stem tests. Not applicable; no Drill Stem tests are planned. |
Drilling/Completion Operations | Form: (02 ) 401151263 12/27/2016 | Control of fire hazards. All materials which are considered fire hazards shall be a
minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall
comply with API RP 500 and will comply with the current national electrical code. An
emergency response plan will be generated for this site. |
Drilling/Completion Operations | Form: (02 ) 401151263 12/27/2016 | Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c
(2)Q. |
Drilling/Completion Operations | Form: (02 ) 401151263 12/27/2016 | Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system
will be used for drilling. |
Final Reclamation | Form: (02 ) 401151263 12/27/2016 | Well site cleared. Within 90-day subsequent to the time of plugging and abandonment
of the entire site, superfluous debris and equipment shall be removed from the site. |
Final Reclamation | Form: (02 ) 401151263 12/27/2016 | Identification of plugged and abandoned wells. P&A’d wells shall be identified pursuant
to 319.a.(5). |