Skip to Main Content

COGIS DB

ENCANA OIL & GAS (USA) INC        Project #: 3525
 
Toggle a column header to sort by heading type.
Document IdentifierClassDocument NumberDocument NameFile Size (KB)DateDownload
3525Projects1433335January 2006 Monthly GW Sampling Report6556832/16/2006Download
3525Projects1822328January 2008 Groundwater Monitoring Results349692/7/2008Download
3525Projects1433779Groundwater monitoring results 18th monthly 6th quarterly7108472/9/2007Download
3525Projects1433677Ground Water Monitoring Results 22nd Monthly7827546/26/2007Download
3525Projects1929783Analytical Results - Soil, Water or Ground Water1079262/21/2007Download
3525Projects1433262October 2005 Ground Water Sampling Report60944011/25/2005Download
3525Projects1262338Laboratory Data from 4th Monthly Monitoring from CTL/T36962012/16/2005Download
3525Projects1433214Letter from COGCC TO CTL Thompson, Inc.3053711/7/2005Download
3525Projects1140977Monthly Ground Water Report5600059/29/2005Download
3525Projects1433213Letter from CTL Thompson to COGCC6063011/3/2005Download
3525Projects1433778Ground Water Sampling Results- 28th Monthly4890541/9/2008Download
3525Projects1821710Groundwater Monitoring Results 20th monthly8221194/18/2007Download
3525Projects1821378Monthly Ground Water reports Nov. 06, Jan 079016101/25/2007Download
3525Projects1821376Groundwater monitoring results 17th monthly4838021/22/2007Download
3525Projects1821145Groundwater Monitoring Results 236307838/27/2007Download
3525Projects1756051Groundwater Monitoring Results1416156/4/2008Download
3525Projects1433307GW Monitoring Results - 5th Monthly7203011/17/2006Download
3525Projects1140978Monthly Ground Water Report - Figure 13296469/29/2005Download
3525Projects1433837Februrary 2008 Groundwater Monitoring Results9718752/25/2008Download
3525Projects1395560Ground Water Monitoring Results - 9th Monthly, 3rd Quarterly5829905/15/2006Download
3525Projects1396518August 2006 GW Sampling Attachment A Diagrams75085810/20/2006Download
3525Projects1433838December 2007 Groundwater Monitoring Results9231632/11/2008Download
3525Projects1821714Monitoring Well Replacement120877710/16/2007Download
3525Projects1433626Monthly Ground Water Report 03/079561674/26/2007Download
3525Projects1433202Letter from CTL Thompson to Eagle Homes of Co., Inc.1050388/22/2005Download
1234