Planning | Form: (02A ) 401013572 8/7/2016 | The nearest building unit is located 1321’ away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c. |
Storm Water/Erosion Control | Form: (02A ) 401013572 8/7/2016 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the Ditch: 0' E Elev: 4973', Ditch: 8' S Elev 4968', Big Dry Creek: 527' SE Elev: 4956', Man-made Pond: 536' W Elev: 4981', Intermittent Pond: 636' E Elev: 4959'
of this proposed oil and gas location. |