COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
402098969
7/2/2020
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered.
EngineerForm: (02 )
402098969
7/2/2020
Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
EngineerForm: (02 )
402098969
7/21/2020
Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. 05-001-08482, EDNA 1 05-001-09473, MELISSA 13-8 05-001-08327, GREEN #1
EngineerForm: (02 )
402098969
7/21/2020
Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. 05-001-09250, HSR-MILE HIGH 6-6 05-123-08740, ADAM TEN 1-A 05-001-06702, ADAM TEN LTD 1 05-001-06992,MILE-HI DUCK CLUB-PASCOE #1 05-001-06996,MILE-HI DUCK CLUB-TRACY #1 05-001-06699, VAN AIRE 1
EngineerForm: (02 )
402098969
7/21/2020
Operator acknowledges the proximity of the operated wells. Operator assures that these offset wells will be remediated per the DJ Basin Horizontal Offset Policy (option 4). Operator will submit a Form 42 (“OTHER- AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. 05-001-09188, ADAM 10 'B' UNIT 1 (Bradenhead pressure data will be monitored and collected during the pad’s hydraulic fracturing treatment. After the stimulation of the pad is complete, submit a Form 4 Sundry with the pressure data.) 05-123-09972, STATE OF COLORADO #1-36CG (operator will not complete County Line 3112-02H within 1500’ of this well - estimated 500’ FNL based on preliminary trajectory. TPZ of 3112-01H and 3112-03H are greater than 1500’ away.)
PermitForm: (02 )
402098969
8/3/2020
This Permit to Drill is approved subject to all the BMPs and COAs on the most recently approved Form 2A and any subsequently approved Form 4 for the Oil and Gas Location (Location ID 474767). The most recently approved Form 2A and any subsequent Form 4s containing applicable COAs for this location shall be posted onsite during construction, drilling, and completions operations.
PermitForm: (02 )
402098969
8/3/2020
If the location has not been built by the Form 2A (Doc #402092786) expiration date of 04/01/2023, Operator must Refile the Form 2A for approval prior to location construction.
PermitForm: (04 )
402862065
12/7/2021
COGCC COA: Operator will ensure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval (2) describe how the wellbore beyond the unit boundary setback is physically isolated and (3) certify that none of the wellbore beyond the setback was completed.
EngineerForm: (04 )
402862065
12/16/2021
Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the Horizontal Offset Policy (option 4). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Operator will ensure the wellbore has a 5,000 psi wellhead, avoid stimulation with 1500' of the offset well, and monitor casing (surface and production) pressures during the entire stimulation treatment. Putnam #41-18 (001-06783)
EngineerForm: (04 )
403168582
9/19/2022
Operator shall continue to monitor pressure, and report to COGCC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead test and sundry must be filed.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
402098969
8/19/2020
Operator will perform anti-collision evaluation of all active (producing, shut-in, of temporarily abandoned) offset wellbores that have the potential of being within 150' feet of the proposed well prior to drilling operations. Notice shall be given to all offset operators prior to drilling.
Drilling/Completion OperationsForm: (02 )
402098969
8/19/2020
Rule 604.c.I: Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections shall be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results shall be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
Drilling/Completion OperationsForm: (02 )
402098969
8/19/2020
Alternative Logging Program - One of the first wells drilled on the pad will be logged with Open Hole Resistivity Log and Gamma Ray Log from the kick-off point to into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state "Alternative Logging Program - No open-hole logs were run" and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
Drilling/Completion OperationsForm: (02 )
402098969
8/19/2020
Operator will comply with COGCC policy on bradenhead monitoring during Hydraulic Fracturing Treatment in the Greater Wattenberg Area per policy dated May 29. 2012.