Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51172
Well Classification: OW Status: PR - 8/9/2022
Well Name/No:County Line #3107-06H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/9/2022
FacilityID:477673LocationID:474767
Municipality/County:LOCHBUIE / WELD #123Location:SWSE 31 1N65W 6
Field:WATTENBERG - #90750Elevation:5041 ft.
Planned Location:340FSL  2015 FELLat/Long: 40.001456 / -104.704468Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2022
End Date: 7/7/2022
Reported: 8/3/2022
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/9/2022             Measured TD: 17597 ft.    Vertical TD: 7502 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/9/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/18/2022
Proposed Top PZ Location:Sec:6 Twp: 1S 65W Footage: 490 FNL  864 FWL
Bottom Hole Location:Sec:7 Twp: 1S 65W Footage: 379 FSL  799 FWL
Proposed Depth/Form:17194 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3650 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3650 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3650 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1827 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 1827 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17654 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2209, Top: 0 ft., Bottom: 17654 ft.

Wellbore Completed
Completion Date:12/21/2021
Spud Date:8/21/2021Spud Date Is:ACTUAL
Measured TD:17597 ft.Measured PB depth:17511 ft.
True Vertical TD:7502 ft.True Vertical PB depth:7501 ft.
Top PZ Location:Sec:6 Twp: 1S 65WFootage: 490 FNL  864 FWL
Bottom Hole Location:Sec:7 Twp: 1S 65WFootage: 379 S  799 W
Log Types:MWD/LWD, CBL, RES run on county Line 3112 API 05-123-51171
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1812 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 1812 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17597 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2410, Top: 250 ft., Bottom: 17597 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1277 ft.
PIERRE1278 ft.
PARKMAN4499 ft.
SUSSEX4916 ft.
SHANNON5310 ft.
SHARON SPRINGS7368 ft.
NIOBRARA7386 ft.
FORT HAYS8017 ft.
CODELL8147 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/23/2024                 Interval Top: 10468 ft.    Interval Bottom: 11651 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2024Treatment End Date:N/A
Treatment Summary:10468-11651
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10468 ft.# Of Holes:1698
Interval Bottom:11651 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/23/2024                 Interval Top: 10164 ft.    Interval Bottom: 13546 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2024Treatment End Date:N/A
Treatment Summary:10164-10467, 13115-13546
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10164 ft.# Of Holes:1698
Interval Bottom:13546 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 8/9/2022                  Interval Top: 8208 ft.    Interval Bottom: 17418 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/25/2022Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/24/2022Treatment End Date:7/7/2022
Treatment Summary:FR Water:490401 bbl, Treated Water 10652 bbl, Fresh Water 2787 bbl (21161258 gallons), 28% HCL 811 bbl. Proppant: 100 Mesh 3,539,535 lbs 40/70 White 14,457,225 lbs. Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):504651Max pressure during treatment (psi):12483
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):811Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16040
Fresh water used in treatment (bbls):503840Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17996760Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7678 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/9/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 676
BBLS_OIL 571
BTU_GAS 1516
CALC_BBLS_H2O 676
CALC_BBLS_OIL 571
CALC_GOR 811
CALC_MCF_GAS 463
CASING_PRESS 850
GRAVITY_OIL 41
MCF_GAS 463
Perforation Data:
Interval Top:8208 ft.# Of Holes:1698
Interval Bottom:17418 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/23/2024                 Interval Top: 8208 ft.    Interval Bottom: 17418 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2024Treatment End Date:N/A
Treatment Summary:8208-10164, 11652-13114, 13547-17418
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8208 ft.# Of Holes:1698
Interval Bottom:17418 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)33100
Total Gas Produced (MCF)139184
GOR4204
GOR DeterminationBOE
Average BOE per Day156.391
Average MCFE per Day907.068

 Federal Financial Assurance  i 

 Tribal Well  i No