Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51172
Well Classification: OW Status: PR - 8/9/2022
Well Name/No:County Line #3107-06H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/9/2022
FacilityID:477673LocationID:474767
Municipality/County:LOCHBUIE / WELD #123Location:SWSE 31 1N65W 6
Field:WATTENBERG - #90750Elevation:5041 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:340FSL  2015 FELLat/Long: 40.001456 / -104.704468Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.001457 / -104.704465Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2022
End Date: 7/7/2022
Reported: 8/3/2022
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/9/2022             Measured TD: 17597 ft.    Vertical TD: 7502 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/9/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/18/2022
Proposed Top PZ Location:Sec:6 Twp: 1S 65W Footage: 490 FNL  864 FWL
Bottom Hole Location:Sec:7 Twp: 1S 65W Footage: 379 FSL  799 FWL
Proposed Depth/Form:17194 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3650 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3650 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3650 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1827 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 1827 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17654 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2209, Top: 0 ft., Bottom: 17654 ft.

Wellbore Completed
Completion Date:12/21/2021
Spud Date:8/21/2021Spud Date Is:ACTUAL
Measured TD:17597 ft.Measured PB depth:17511 ft.
True Vertical TD:7502 ft.True Vertical PB depth:7501 ft.
Top PZ Location:Sec:6 Twp: 1S 65WFootage: 490 FNL  864 FWL
Bottom Hole Location:Sec:7 Twp: 1S 65WFootage: 379 FSL  799 FWL
Log Types:MWD/LWD, CBL, RES run on county Line 3112 API 05-123-51171
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1812 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 1812 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17597 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2410, Top: 250 ft., Bottom: 17597 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1277 ft.
PIERRE1278 ft.
PARKMAN4499 ft.
SUSSEX4916 ft.
SHANNON5310 ft.
SHARON SPRINGS7368 ft.
NIOBRARA7386 ft.
FORT HAYS8017 ft.
CODELL8147 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/23/2024                 Interval Top: 10468 ft.    Interval Bottom: 11651 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2024Treatment End Date:N/A
Treatment Summary:10468-11651
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10468 ft.# Of Holes:1698
Interval Bottom:11651 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/23/2024                 Interval Top: 10164 ft.    Interval Bottom: 13546 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2024Treatment End Date:N/A
Treatment Summary:10164-10467, 13115-13546
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10164 ft.# Of Holes:1698
Interval Bottom:13546 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 8/9/2022                  Interval Top: 8208 ft.    Interval Bottom: 17418 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/25/2022Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/24/2022Treatment End Date:7/7/2022
Treatment Summary:FR Water:490401 bbl, Treated Water 10652 bbl, Fresh Water 2787 bbl (21161258 gallons), 28% HCL 811 bbl. Proppant: 100 Mesh 3,539,535 lbs 40/70 White 14,457,225 lbs. Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):504651Max pressure during treatment (psi):12483
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):811Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16040
Fresh water used in treatment (bbls):503840Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17996760Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7678 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/9/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 676
BBLS_OIL 571
BTU_GAS 1516
CALC_BBLS_H2O 676
CALC_BBLS_OIL 571
CALC_GOR 811
CALC_MCF_GAS 463
CASING_PRESS 850
GRAVITY_OIL 41
MCF_GAS 463
Perforation Data:
Interval Top:8208 ft.# Of Holes:1698
Interval Bottom:17418 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/23/2024                 Interval Top: 8208 ft.    Interval Bottom: 17418 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2024Treatment End Date:N/A
Treatment Summary:8208-10164, 11652-13114, 13547-17418
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8208 ft.# Of Holes:1698
Interval Bottom:17418 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)21129
Total Gas Produced (MCF)116851
GOR5530
GOR DeterminationBOE
Average BOE per Day113.264
Average MCFE per Day656.913

 Federal Financial Assurance  i 

 Tribal Well  i No