Material Handling and Spill Prevention | Form: (02 ) 400702543 11/20/2014 | Load-lines. All load-lines shall be bull-plugged or capped. |
Noise mitigation | Form: (02 ) 400702543 11/20/2014 | If determined necessary, lighting abatement measures shall be implemented, including the installation of lighting shield devices on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding is not believed necessary as this is an industrial area and the only building unit within 1,000' is owned by the operator, however, at its election the operator may install temporary engineering controls consisting of perimeter sound walls during drilling and completion activities to provide noise relief. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered. |
Drilling/Completion Operations | Form: (02 ) 400702543 11/20/2014 | Green Completions – No hydrocarbons anticipated – NA. |
Drilling/Completion Operations | Form: (02 ) 400702543 11/20/2014 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certification. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid. |
Drilling/Completion Operations | Form: (02 ) 400702543 11/20/2014 | Drill stem tests. Not applicable; no Drill Stem tests are planned. |
Drilling/Completion Operations | Form: (02 ) 400702543 11/20/2014 | Well will be logged with an open hole logging tool with gamma ray. A CBL will be run on all production casing or, in the case of a production liner, the intermediate casing, when these casing strings are run. |
Drilling/Completion Operations | Form: (02 ) 400702543 11/20/2014 | Control of fire hazards. All materials which are considered fire hazards shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API RP 500 and will comply with the current national electrical code. An emergency response plan has been generated for this site. No CBL over slotted liner completion. |
Drilling/Completion Operations | Form: (02 ) 400702543 11/20/2014 | Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c (2)Q. |
Drilling/Completion Operations | Form: (02 ) 400702543 11/20/2014 | Logging – A resistivity log, run from the bottom of the surface casing to total depth of the disposal well or wells or any well within one (1) mile together with a log from that well that can be correlated with the injection well. If the disposal well is to be drilled, a description of the typical stratigraphic level of the disposal formation in the disposal well or wells, and any other available logging or testing data, on the disposal well or wells will be supplied. |
Final Reclamation | Form: (02 ) 400702543 11/20/2014 | Well site cleared. Within 90-day subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. Plugged and abandoned wells will be identified. P&A’d wells shall be identified pursuant to 319.a.(5). |
Underground Injection Control | Form: (02 ) 400702543 11/20/2014 | Formation Water, Mechanical Integrity, & Step Rate Tests will be done prior to approval to inject. |