|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: TA - 8/11/2021 Measured TD: 10560 ft. Wellbore Data for Original Wellbore | Wellbore Classification: DSPW TA - 8/11/2021 | Wellbore Permit | | Permit #: | | Expiration Date: | 11/19/2016 | Proposed Depth/Form: | 10640 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | Not available | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: ADMI , Formation: ADMIRE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: AMZN , Formation: AMAZON , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: COUGR , Formation: COUNCIL GROVE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: DSMS , Formation: DES MOINES , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: FNTN , Formation: FOUNTAIN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LSTKA , Formation: LOWER SATANKA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MSSR , Formation: MISSOURI , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRGL , Formation: VIRGIL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 267, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8782 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 123, Top: 7407 ft., Bottom: 8782 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8700 ft., Depth: 10640 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7407 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 691, Top: 0 ft., Bottom: 7407 ft. |
| | |
Wellbore Completed | Completion Date: | 3/16/2015 | Spud Date: | 2/28/2015 | Spud Date Is: | ACTUAL | Measured TD: | 10560 ft. | Measured PB depth: | 10560 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Mud & CBL in .pdf & Triple Combo in both .pdf & .las | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1030 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 0 ft., Bottom: 1030 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8783 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 156, Top: 340 ft., Bottom: 8783 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8687 ft., Depth: 10560 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: 1ST , Top: 350 ft., Depth: 7330 ft., Bottom: 7330 ft., Sacks: 701, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6842 ft. | 7102 ft. | N | N | FORT HAYS | 7102 ft. | 7127 ft. | N | N | CODELL | 7127 ft. | 7143 ft. | N | N | CARLILE | 7143 ft. | 7192 ft. | N | N | GREENHORN | 7192 ft. | 7416 ft. | N | N | X BENTONITE | 7416 ft. | 7585 ft. | N | N | J SAND | 7585 ft. | 7704 ft. | N | N | SKULL CREEK | 7704 ft. | 7770 ft. | N | N | DAKOTA | 7770 ft. | 7928 ft. | N | N | MORRISON | 7928 ft. | 8186 ft. | N | N | ENTRADA | 8186 ft. | 8240 ft. | N | N | LYKINS | 8240 ft. | 8588 ft. | N | N | FORELLE | 8588 ft. | 8662 ft. | N | N | MINNEKAHTA | 8662 ft. | 8750 ft. | N | N | BLAINE | 8750 ft. | 8783 ft. | N | N | LYONS | 8783 ft. | 8972 ft. | N | N | LOWER SATANKA | 8972 ft. | 9254 ft. | N | N | WOLFCAMP | 9254 ft. | 9313 ft. | N | N | AMAZON | 9313 ft. | 9372 ft. | N | N | COUNCIL GROVE | 9372 ft. | 9548 ft. | N | N | ADMIRE | 9548 ft. | 9620 ft. | N | N | VIRGIL | 9620 ft. | 9846 ft. | N | N | MISSOURI | 9846 ft. | 9983 ft. | N | N | FOUNTAIN | 9983 ft. | 10156 ft. | N | N | DES MOINES | 10156 ft. | 10446 ft. | N | N | ATOKA | 10446 ft. | 10560 ft. | N | N |
Formation ATOK Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 10446 ft. Interval Bottom: 10560 ft. Completed Information for Formation ATOKA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | ATOKA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation ATOK. |
| Perforation Data: | Interval Top: | 10446 ft. | # Of Holes: | | Interval Bottom: | 10560 ft. | Hole Size: | |
|
Formation DSMS Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 10156 ft. Interval Bottom: 10446 ft. Completed Information for Formation DES MOINES | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DES MOINES | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DSMS. |
| Perforation Data: | Interval Top: | 10156 ft. | # Of Holes: | | Interval Bottom: | 10446 ft. | Hole Size: | |
|
Formation FNTN Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 9983 ft. Interval Bottom: 10156 ft. Completed Information for Formation FOUNTAIN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FOUNTAIN | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FNTN. |
| Perforation Data: | Interval Top: | 9983 ft. | # Of Holes: | | Interval Bottom: | 10156 ft. | Hole Size: | |
|
Formation MSSR Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 9846 ft. Interval Bottom: 9983 ft. Completed Information for Formation MISSOURI | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MISSOURI | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MSSR. |
| Perforation Data: | Interval Top: | 9846 ft. | # Of Holes: | | Interval Bottom: | 9983 ft. | Hole Size: | |
|
Formation VRGL Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 9620 ft. Interval Bottom: 9846 ft. Completed Information for Formation VIRGIL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | VIRGIL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation VRGL. |
| Perforation Data: | Interval Top: | 9620 ft. | # Of Holes: | | Interval Bottom: | 9846 ft. | Hole Size: | |
|
Formation ADMI Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 9548 ft. Interval Bottom: 9620 ft. Completed Information for Formation ADMIRE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | ADMIRE | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation ADMI. |
| Perforation Data: | Interval Top: | 9548 ft. | # Of Holes: | | Interval Bottom: | 9620 ft. | Hole Size: | |
|
Formation COUGR Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 9372 ft. Interval Bottom: 9548 ft. Completed Information for Formation COUNCIL GROVE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | COUNCIL GROVE | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation COUGR. |
| Perforation Data: | Interval Top: | 9372 ft. | # Of Holes: | | Interval Bottom: | 9548 ft. | Hole Size: | |
|
Formation AMZN Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 9313 ft. Interval Bottom: 9372 ft. Completed Information for Formation AMAZON | 1st Production Date: | N/A | Choke Size: | | Formation Name: | AMAZON | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation AMZN. |
| Perforation Data: | Interval Top: | 9313 ft. | # Of Holes: | | Interval Bottom: | 9372 ft. | Hole Size: | |
|
Formation WFCMP Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 9254 ft. Interval Bottom: 9313 ft. Completed Information for Formation WOLFCAMP | 1st Production Date: | N/A | Choke Size: | | Formation Name: | WOLFCAMP | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCMP. |
| Perforation Data: | Interval Top: | 9254 ft. | # Of Holes: | | Interval Bottom: | 9313 ft. | Hole Size: | |
|
Formation LSTKA Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 8972 ft. Interval Bottom: 9254 ft. Completed Information for Formation LOWER SATANKA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | LOWER SATANKA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LSTKA. |
| Perforation Data: | Interval Top: | 8972 ft. | # Of Holes: | | Interval Bottom: | 9254 ft. | Hole Size: | |
|
Formation DJINJ Formation Classification: DSPW Status: TA - 8/11/2021 Interval Top: 8783 ft. Interval Bottom: 10560 ft. Completed Information for Formation DENVER BASIN COMBINED DISPOSAL ZONE | 1st Production Date: | 6/21/2015 | Choke Size: | | Formation Name: | DENVER BASIN COMBINED DISPOSAL ZONE | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/28/2021 | Treatment End Date: | N/A | Treatment Summary: | Temporarily Abandoned after MIT on 06/28/2021. Run guage ring for 7" 26# pipe, tag at 8583'. Run WRP and set @ 8578'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 4/16/2015 | Treatment End Date: | 4/18/2015 | Treatment Summary: | The Actual Injection Zone top is from the open hole cemented depth of the First String at 8790' & the PBTD of the well is 10,553' making the DJINJ = 8790' - 10,553'. Total Acid figure below includes all Chemicals. | Total fluid used in treatment (bbls): | 3594 | Max pressure during treatment (psi): | 1418 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 191 | Min frac gradient (psi/ft): | 0.47 | Recycled water used in treatment (bbls): | 3403 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DJINJ. |
| Perforation Data: | Interval Top: | 8783 ft. | # Of Holes: | | Interval Bottom: | 10560 ft. | Hole Size: | |
|
Formation LYNS Formation Classification: DSPW Status: CM - 8/11/2021 Interval Top: 8783 ft. Interval Bottom: 8972 ft. Completed Information for Formation LYONS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | LYONS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LYNS. |
| Perforation Data: | Interval Top: | 8783 ft. | # Of Holes: | | Interval Bottom: | 8972 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 10/29/2024 |
Defined Inactive (UIC) | Y | Defined Inactive 05/31/2021 |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|