LocationLocation IDRelated Facilities
WELL05-123-30012KERR-MCGEE
19-3i
KERR MCGEE OIL & GAS ONSHORE LP
47120
IJ
1/1/2025
WATTENBERG
90750
WELD  123
NWSW 3 1N68W 6
302913View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
404025318
12/16/2024
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (04 )
404111320
3/12/2025
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (04 )
404304077
8/7/2025
Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet reaction threshold or indicate a deficiency, a new bradenhead test and sundry must be filed.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (04 )
404025318
12/27/2024
Site lighting will be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units.
Community Outreach and NotificationForm: (04 )
404025318
12/27/2024
Courtesy notifications will be sent to all parcel owners with building units within 2,000 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
Community Outreach and NotificationForm: (04 )
404025318
12/27/2024
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard.
WildlifeForm: (04 )
404025318
12/27/2024
This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & ECMC data) as well as internal wildlife datasets and aerial imagery. All field personnel are trained to identify wildlife risks and raise concerns noticed during operations with the Kerr McGee's Health, Safety, and Environment (HSE) department.
Dust controlForm: (04 )
404025318
12/27/2024
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
404025318
12/27/2024
Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.
PlanningForm: (04 )
404111320
3/12/2025
Site lighting will be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units.
Community Outreach and NotificationForm: (04 )
404111320
3/12/2025
Courtesy notifications will be sent to all parcel owners with building units within 2,000 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
Community Outreach and NotificationForm: (04 )
404111320
3/12/2025
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard.
WildlifeForm: (04 )
404111320
3/12/2025
This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & ECMC data) as well as internal wildlife datasets and aerial imagery. All field personnel are trained to identify wildlife risks and raise concerns noticed during operations with the Kerr McGee's Health, Safety, and Environment (HSE) department.
Dust controlForm: (04 )
404111320
3/12/2025
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
404111320
3/12/2025
Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.