Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30012
Well Classification: DSPW Status: SI - 3/1/2024
Well Name/No:KERR-MCGEE #19-3i
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2024
FacilityID:301377LocationID:302913
County:WELD #123Location:NWSW 3 1N68W 6
Field:WATTENBERG - #90750Elevation:5051 ft.
Planned Location:1700FSL  1181 FWLLat/Long: 40.077710 / -104.994730Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.077683 / -104.994711Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: SI - 3/1/2024             Measured TD: 10208 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        SI - 3/1/2024
Wellbore Permit
Permit #:20090174 Expiration Date:2/5/2010
Proposed Depth/Form:9700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: EN-LY , Formation: ENTRADA-LYONS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: FNTN , Formation: FOUNTAIN , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: S.C. 1.1, Hole Size: , Size: 2.875 in., Top: , Depth: 9285 ft., Weight: 6.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 9385 ft.

Wellbore Completed
Completion Date:4/27/2009
Spud Date:4/6/2009Spud Date Is:ACTUAL
Measured TD:10208 ft.Measured PB depth:10149 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, ML, AILC, CNLD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 942 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1500, Top: 0 ft., Bottom: 942 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 10195 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1262, Top: 1150 ft., Bottom: 10195 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1078 ft.NN
PARKMAN3459 ft.NN
SUSSEX4553 ft.4705 ft.NN
SHANNON5128 ft.5155 ft.NN
NIOBRARA7489 ft.NN
FORT HAYS7766 ft.NN
CODELL7787 ft.NN
GREENHORN7856 ft.NN
J SAND8219 ft.NN
DAKOTA8391 ft.NN
MORRISON8562 ft.NN
ENTRADA8728 ft.NN
LYONS9384 ft.NN
FOUNTAIN9715 ft.NN

Formation FNTN                     Formation Classification:  DSPW                     Status:  SI - 3/1/2024                  Interval Top: 9795 ft.    Interval Bottom: 10075 ft.

 Completed Information for Formation FOUNTAIN
1st Production Date:N/AChoke Size: 
Formation Name:FOUNTAINCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2009
Treatment Summary:INTERVAL TEST PERFORMATIONS, INJECTION WELL TO GO OPERATIONAL IN 2010, WILL PROVIDE FRAC INFORMATION AT THAT TIME.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FNTN.
Perforation Data:
Interval Top:9795 ft.# Of Holes:120
Interval Bottom:10075 ft.Hole Size:0.48 in.

Formation LYNS                     Formation Classification:  DSPW                     Status:  SI - 3/1/2024                  Interval Top: 9389 ft.    Interval Bottom: 9498 ft.

 Completed Information for Formation LYONS
1st Production Date:4/10/2012Choke Size: 
Formation Name:LYONSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2012
Treatment Summary:4/04/2012 perforated Lyons only - no treatment 4/10/2012 date of 1st Injection, 2320 bbls
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation LYNS.
Perforation Data:
Interval Top:9389 ft.# Of Holes:196
Interval Bottom:9498 ft.Hole Size:0.39 in.

Formation ENRD                     Formation Classification:  DSPW                     Status:  SI - 3/1/2024                  Interval Top: 8808 ft.    Interval Bottom: 8838 ft.

 Completed Information for Formation ENTRADA
1st Production Date:4/10/2012Choke Size: 
Formation Name:ENTRADACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2012
Treatment Summary:4/04/2012 perforated Entrada only - no treatment 4/10/2012 date of 1st Injection, 2320 bbls
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation ENRD.
Perforation Data:
Interval Top:8808 ft.# Of Holes:60
Interval Bottom:8838 ft.Hole Size:0.39 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/17/2025
Defined Inactive (UIC)YDefined Inactive
02/29/2024
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No