|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 7/1/2025 Measured TD: 10208 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 7/1/2025 | | Wellbore Permit | | | Permit #: | 20090174 | Expiration Date: | 2/5/2010 | | Proposed Depth/Form: | 9700 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: EN-LY , Formation: ENTRADA-LYONS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: FNTN , Formation: FOUNTAIN , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: 2.875 in., Top: , Depth: 9285 ft., Weight: 6.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: 9385 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/27/2009 | | Spud Date: | 4/6/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 10208 ft. | Measured PB depth: | 10149 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | CBL, ML, AILC, CNLD | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 942 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1500, Top: 0 ft., Bottom: 942 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 10195 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1262, Top: 1150 ft., Bottom: 10195 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 1078 ft. | | N | N | | PARKMAN | 3459 ft. | | N | N | | SUSSEX | 4553 ft. | 4705 ft. | N | N | | SHANNON | 5128 ft. | 5155 ft. | N | N | | NIOBRARA | 7489 ft. | | N | N | | FORT HAYS | 7766 ft. | | N | N | | CODELL | 7787 ft. | | N | N | | GREENHORN | 7856 ft. | | N | N | | J SAND | 8219 ft. | | N | N | | DAKOTA | 8391 ft. | | N | N | | MORRISON | 8562 ft. | | N | N | | ENTRADA | 8728 ft. | | N | N | | LYONS | 9384 ft. | | N | N | | FOUNTAIN | 9715 ft. | | N | N |
Formation FNTN Formation Classification: DSPW Status: IJ - 7/1/2025 Interval Top: 9730 ft. Interval Bottom: 10120 ft.| Completed Information for Formation FOUNTAIN | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FOUNTAIN | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/18/2009 | | Treatment Summary: | CORRECTING PRODUCTION INTERVAL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FNTN. |
| | Perforation Data: | | Interval Top: | 9730 ft. | # Of Holes: | 120 | | Interval Bottom: | 10120 ft. | Hole Size: | 0.48 in. |
|
Formation LYNS Formation Classification: DSPW Status: IJ - 7/1/2025 Interval Top: 9389 ft. Interval Bottom: 9498 ft.| Completed Information for Formation LYONS | | 1st Production Date: | 4/10/2012 | Choke Size: | | | Formation Name: | LYONS | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/4/2012 | | Treatment Summary: | 4/04/2012 perforated Lyons only - no treatment
4/10/2012 date of 1st Injection, 2320 bbls |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation LYNS. |
| | Perforation Data: | | Interval Top: | 9389 ft. | # Of Holes: | 196 | | Interval Bottom: | 9498 ft. | Hole Size: | 0.39 in. |
|
Formation ENRD Formation Classification: DSPW Status: IJ - 7/1/2025 Interval Top: 8808 ft. Interval Bottom: 8838 ft.| Completed Information for Formation ENTRADA | | 1st Production Date: | 4/10/2012 | Choke Size: | | | Formation Name: | ENTRADA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/4/2012 | | Treatment Summary: | 4/04/2012 perforated Entrada only - no treatment
4/10/2012 date of 1st Injection, 2320 bbls |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation ENRD. |
| | Perforation Data: | | Interval Top: | 8808 ft. | # Of Holes: | 60 | | Interval Bottom: | 8838 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|