Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-17881JOHNSON
11-16G6
NOBLE ENERGY INC
100322
PA
4/22/2019
WATTENBERG
90750
WELD  123
SESE 11 6N66W 6
329817View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401894094
1/10/2019
This approval is good for one year and a new application must be made before November 30, 2019. Updates for the planned utilization of the well should be included with the application. If the well is not returned to production within two years(of the initial pressure test) an MIT will be performed. The Form 7 reporting must match the actual status of the wellbore.
EngineerForm: (04 )
401246358
1/10/2019
This approval is good for one year and a new application must be made before November 30, 2018. Updates for the planned utilization of the well should be included with the application. If the well is not returned to production within two years(of the initial pressure test) an MIT will be performed. The Form 7 reporting must match the actual status of the wellbore.
EngineerForm: (04 )
401898572
1/23/2019
This approval is good for one year and a new application must be made before November 30, 2019. Updates for the planned utilization of the well should be included with the application. If the well is not returned to production within two years(of the initial pressure test) an MIT will be performed. The Form 7 reporting must match the actual status of the wellbore.
PermitForm: (06 )
401918285
1/28/2019
Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 309 within 30 days -Missing Codell production reporting 4/2009-10/2009
EngineerForm: (06 )
401918285
2/1/2019
If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations, a Bradenhead test shall be performed. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. 3) If sampling is required contact COGCC engineering for a confirmation of plugging requirements prior to placing any plugs. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (06 )
401918285
2/1/2019
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06 )
401918285
2/1/2019
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Prior to placing the 751’ plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 501’ or shallower and provide 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug. 5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44.
 
COGIS - Best Management Practice Results
No records to display.