Wellbore #00 Wellbore Classification: GW Status: PA - 4/22/2019 Measured TD: 8044 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/22/2019 | Wellbore Permit | DRIFTED | Permit #: | 20021602 | Expiration Date: | 8/29/2003 | Proposed Depth/Form: | 7255 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 318A , Unit Acreage: 80, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 551 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: , Top: 0 ft., Bottom: 551 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8006 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: 6576 ft., Bottom: 8006 ft. |
| | |
Wellbore Completed | Completion Date: | 3/18/1994 | Measured TD: | 8044 ft. | Measured PB depth: | 7923 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | DIFL/GR/CAL;CDN/GR;MA/GR;GR/CL;CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 551 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 371, Top: 0 ft., Bottom: 551 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8006 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 6574 ft., Bottom: 8006 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | CODELL | 7287 ft. | 7298 ft. | | | J SAND | 7682 ft. | 7720 ft. | | |
Formation JSND Formation Classification: GW Status: AB - 4/22/2019 Interval Top: 7682 ft. Interval Bottom: 7720 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/12/1994 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/18/1994 | Treatment Summary: | ISOLATE W/CIBP SET @7370' ON 9/6/02 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7682 ft. | # Of Holes: | 76 | Interval Bottom: | 7720 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 4/22/2019 Interval Top: 7239 ft. Interval Bottom: 7255 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/1/2002 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/18/1994 | Treatment Summary: | 127,890 GAL VISTAR 22/20# GEL & 245,700# 20/40 OTTAWA SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2035 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 1 | CALC_BBLS_OIL | 100 | CALC_GOR | 15000 | CALC_MCF_GAS | 1500 | CASING_PRESS | 650 | MCF_GAS | 15 | TUBING_PRESS | 650 |
| Perforation Data: | Interval Top: | 7239 ft. | # Of Holes: | 64 | Interval Bottom: | 7255 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 04/22/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|