Engineer | Form: (04 ) 400775279 1/22/2015 | 1) The additional cement referenced shall be placed as indicated and comply with Rule 317.j. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report.
2) Please submit gyro survey data with Form 5 Drilling Completion Report. |
Engineer | Form: (06 ) 401142927 11/4/2016 | 1) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
2) Please submit gyro survey data with Form 6 (s) Subsequent Report of Abandonment.
3) Submit referenced CBL with Form 6 (s) Subsequent Report of Abandonment.
4) Note- stub plug is also shoe plug. After pumping stub/shoe plug, shut down and wait on cement at minimum 4 hours; verify gas migration has been eliminated. If evidence of gas migration or pressure remains contact COGCC Engineer for an update to plugging orders. Plug must be tagged at 580’ or shallower. Leave at least 100’ cement in the wellbore for each plug. |
Engineering Tech | Form: (06 ) 401169469 12/27/2017 | Requested Gyro survey as part of COA |